background image

6

 

Eastwood Technical Assistance: 800.343.9353  >>  [email protected]

FIG. 9

FIG. 10

FIG. 8

INSTALLATION

Lower Blade

1. 

Set the Lower Blade onto the ledge of Lower Main Body with the 
three mounting holes aligned with those in the Main Body.

2. 

Place the three Mounting Bolts with Washers into the holes in the 
front of the Main Body and thread them into the Blade 

(FIG 8)

.

3. 

Tighten Bolts with a 16mm wrench (not included).

UPPER BLADE

1. 

Set the Upper Blade into place behind the Lower Blade with the pivot 
holes of the Upper Blade and Main Body aligned. 

2. 

Place the Main Pivot Shoulder Bolt through the Upper Blade and Main 
Body pivot holes.

3. 

Thread the Pivot Nut onto the Pivot Bolt until it is firmly finger-tight. 
Do not overtighten which can cause binding 

(FIG 9)

.

4. 

Thread the Pivot Locknut onto the Pivot Bolt and using two 21mm 
wrenches (not included), lock it into place against the Pivot Nut.

5. 

Carefully raise the Upper Blade and insert a large screwdriver into the 
Shear Holes of the Upper Blade and Main Body 

(FIG 10)

.

6. 

In addition, for safety, place a section of 2” x 4” or other suitable 
wood between the upper and lower blades 

(FIG 10)

.

7. 

Move the Handle slightly forward and back to achieve alignment of 
the through holes of the Actuating Link and Upper Blade.

8. 

Insert the Pivot Shoulder Bolt and thread on the Nut then firmly finger 
tighten. 13mm and 14mm Wrenches (not included) may be used 
however do not overtighten which will cause binding 

(FIG 10)

.

9. 

Remove the screwdriver from the Shear Holes.

 

  The following steps must be followed in sequence to 

reduce the danger of injury.

 

  The following steps must be followed in sequence to 

reduce the danger of injury.

Содержание 20198

Страница 1: ...8 BENCH SHEAR INSTRUCTIONS Item 20198...

Страница 2: ...renches DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or serious...

Страница 3: ...stwood Bench Shear was specifically designed to be operated by one person only Never have one person operate the Handle while another handles the workpiece or serious injury could occur Frequently ins...

Страница 4: ...low point raise the Handle then move the material forward placing the uncut area once again at the Blade intersection point CUTTING FLAT MATERIAL With the Handle in the full up position place flat sto...

Страница 5: ...Shoulder Bolt FIG 5 5 At this point the Upper Blade will be free Very carefully hold the Blade with one hand while the previously placed screwdriver is removed from the Shear Holes 6 Carefully withdr...

Страница 6: ...which can cause binding FIG 9 4 Thread the Pivot Locknut onto the Pivot Bolt and using two 21mm wrenches not included lock it into place against the Pivot Nut 5 Carefully raise the Upper Blade and ins...

Страница 7: ...use Check tightness of all hardware Check operation for binding Lubricate all pivot points periodically with a medium bodied lubricating oil Inspect Blades for cracks damage or premature wear Replace...

Страница 8: ...astwood Technical Assistance Service Department 800 343 9353 email techelp eastwood com PDF version of this manual is available online eastwood com 20198manual The Eastwood Company 263 Shoemaker Road...

Отзывы: