
To order parts and supplies: 800.343.9353 >> eastwood.com
5
BLADE REPLACEMENT
REMOVAL
Upper Blade
1.
Raise Handle to open blades.
2.
As a safety precaution, insert a large screwdriver or similar object
into the Shear Holes in the Blade and Shear Body to limit blade move-
ment
(FIG 3)
. In addition, place a section of 2” x 4” or other suitable
wood between the upper and lower blades
(FIG 3)
.
3.
Using 13mm & 14mm wrenches, (not included) Loosen and remove
the Actuating Link Pivot Shoulder Bolt & Nut
(FIG 4)
.
4.
With two 21mm wrenches (not included), loosen and remove the
Main Pivot Locknut, Nut and Shoulder Bolt
(FIG 5)
.
5.
At this point the Upper Blade will be free. Very carefully hold the
Blade with one hand while the previously placed screwdriver is
removed from the Shear Holes.
6.
Carefully withdraw the Upper Blade.
Lower Blade
1.
With a 16mm Wrench (not included), loosen and remove the three
Lower Blade retaining Bolts and Washers
(FIG 6
).
2.
Carefully withdraw the Lower Blade
(FIG 7
).
The blades are extremely sharp! Use extreme care
when handling to avoid severe cuts or loss of fingers!
The following steps must be followed in sequence to
reduce the danger of injury.
FIG. 4
FIG. 5
FIG. 3
FIG. 6
Screw Driver
Main
Pivot Bolt
✓
✓
Link
Pivot Bolt
2” x 4”
✓
Main Pivot Bolt,
Nut, and Locknut
✓
The following steps must be followed in sequence to
reduce the danger of injury.
FIG. 7
Lower
Blade
✓
Содержание 20198
Страница 1: ...8 BENCH SHEAR INSTRUCTIONS Item 20198...