Eastsign P Series Скачать руководство пользователя страница 6

Eastsign

4

2.3.8Cleaningbyrotatingtheroller.Topreventfrompartialdamageforthe

roller,don’tcleanatsinglepoint.

2.3.9Checktoseeifthepowersupplycableandthefootpedalconnection

cablearebrokenonaregularbasistoavoidelectricshock

S

A

F

E

T

YI

N

S

T

R

U

C

T

IO

N

Содержание P Series

Страница 1: ...Eastsign SMSLP20190819 Eastsign Laminator P Serise User Manual...

Страница 2: ...2 Chapter 3 Speci cations 05 Chapter 4 Structure 06 Chapter 5 Installation 14 Chapter 6 Usage of Machine 15 Chapter 7 Laminating Process 19 Chapter 8 Problems and solution 22 Chapter 9 Maintenance 23...

Страница 3: ...ented innovation in the design concept and details will give you simple and relax lamination experience Please read the manual carefully including the installation operation and maintenance to ensure...

Страница 4: ...Hand Anti hot The surface of roller could scald your hand or nger keep away from heating roller B Anti chain Prick Keep your hands away from chain and gear Your long hair and clothing would be caught...

Страница 5: ...hen you use the foot pedal 2 3 Safety Notice 2 3 1 The operator should read the manual before using the machine 2 3 2 The power supply should match the power con guration on the nameplate Use three pl...

Страница 6: ...the roller To prevent from partial damage for the roller don t clean at single point 2 3 9 Check to see if the power supply cable and the foot pedal connection cable are broken on a regular basis to a...

Страница 7: ...Eastsign 5 Chapter 3 Speci cations 3 1 Speci cations of the Machine SPACIFICATIONS...

Страница 8: ...et 3 Shaft 4 left cabinet 5 E stop 6 Feeding table 7 Pressure plate 8 Roller 9 Liner rewind 10 Control panel 11 Right cabinet 12 hand crank 13 Foot pedal 1 Power connection 2 Media rewind 3 Idler bar...

Страница 9: ...CTURE 4 3 Feeding table and pressure plate Feeding table and pressure plate are used to put tension on media and parallel with lm edge Feeding table can be pivoted up via the arm and the tension can b...

Страница 10: ...ng and acid and alkali resistance prevent adhesion from cold laminating lm The bottom roller is controlled by motor the top roller rotated by friction Notice Don t put your hands or nger between top a...

Страница 11: ...move out one side of shaft For assembly left side rst the driven end of each shaft is slotted to engage a key Three rubber strip on the shaft to hold the paper tube The friction wheel is A B C D E Cl...

Страница 12: ...osition Do not adjust STRUCTURE 4 9 Heater One 1300W stainless heater inside the roller Don t touch the connection end in case of electric shock One TCO is installed in one side of heater to cut o the...

Страница 13: ...on knob to change the speed ratio Motor drive roller and media take up through the sprocket wheel Eastsign 11 4 10 Liner distance sensor Liner distance sensor is to measure the roller height and the s...

Страница 14: ...t or Celsius H Control the speed of the roller I Pressure indicator Temperature set The roller temperature controlled by the heating button the monitor indicates roller temperature in 6s Speci cations...

Страница 15: ...e shipping from the factory Do not change the speci cations at random It normally takes 20 minutes for the top roller to reach the temperature of 50 It is normal that the temperature display di ers th...

Страница 16: ...owing place otherwise will a ect the roller temperature which might a ect the laminating quality 5 1 4 After installation adjust each caster to reach level ground The casters only be used on even grou...

Страница 17: ...be used with foot pedal together 6 3 Emergency button In case of emergency press the red button to shut o the electric roller stopped Turn the button clockwise the button will rise up automatically Pr...

Страница 18: ...shaft rotating controlled by friction The friction pad create friction the friction pad will be wear and tear during using Replace the friction pad when friction disappeared Ways to replace take o the...

Страница 19: ...3 When the image is tilted on left side the left side pressure must be bigger than right side Adjust the bolts to reduce the pressure It should be possible to keep same adjustment for bolts on both s...

Страница 20: ...right side cover Loose the parallel nut 4 the roller will be up if tightening down the bottom nut then tighten the top nut otherwise it will be down 6 9 2 The roller is parallel before shipment The r...

Страница 21: ...nating instruction 7 3 Pre heating 7 3 1 Rise the top roller and take o the pressure board 7 3 2 Turn on the machine press running switch speed at 1 7 3 3 Turn on heating the set up temperature is 40...

Страница 22: ...ut the laminated media on the shaft adjust the friction to make automatically take up Note the laminating performance is related to the friction adjustment of all shafts 7 4 Notes for Operation 7 4 1...

Страница 23: ...tracking on the left right of the machine it indicates thepressure on the left side is higher than that on the right side please decrease the pressure see chapter 4 7 4 10 No need heating for cold la...

Страница 24: ...Eastsign 22 P ROBLEMS AND SOLUTIONS Chapter 8 Problems and Solutions First of all please check if any destroy parts on your machine if so repair the broken part then run the machine...

Страница 25: ...enance regularly 9 2 2 Lift the upper rollers after work to prevent deformation of rollers 9 2 3 Make sure the knife or sharp items will not scratch the rollers 9 2 4 To extend the lifetime of the rol...

Страница 26: ...ncorrect or wrong Power o is must be while roller s replacement for safety purpose 9 3 Cleaning 9 3 1 To extend the lifetime of the machines please ensure the machine are clean 9 3 2 Make sure environ...

Страница 27: ...chine when emergency switch is on 4 Release the emergency switch turn on and start to run machine Photocell checking 1 turn on the machine 2 roller rotating 3 hide the photocell check roller rotating...

Страница 28: ...an that for which it was intended or if it has been subjected to misuse abuse accidental damage modi cation improper wiring improper repair incorrect repair or improper installation procedures 10 4 If...

Страница 29: ...ict Shenzhen China Te l 86 755 8296 8521 info eastsign com Eastsign International Ltd Hong Kong Headquarter Rm 1818 18 F Shatin Galleria 18 24 Shan Mei Street Fotan N T Hong Kong Te l 852 2117 0098 in...

Отзывы: