22 Operation
Eastey EZ-EX Main Spring Adjustment
For the Eastey-EX tape head, there is an
adjustment link at the end of the main spring
that links the spring to the stud post.
Spring tension is determined by which part of
the adjustment link is hooked onto the stud
post on the connecting arm, and by which
hole in the adjustment link the main spring is
hooked onto.
Eastey-EX Main Spring Adjustment
For the EZ-EX tape head, there are two
adjustment nuts, one to each side of the top
crossmember where the threaded rod of the
adjustable end of the main spring passes
through the crossmember.
The adjustment nuts are used together to set
the main spring to the required tension and to
secure the spring at the set tension.
Moderate Tension
Most Tension
Least Tension
Decrease Tension
Increase Tension
Main
Spring
Outer
Nut
Inner
Nut
Cross
Member
Adjustment
Link
Main
Spring
Stud
Содержание SB-2EX-Auto
Страница 1: ...SB 2 3EX Auto Automatic Case Taping System User Guide...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 Installation Air Supply Line In Air In...
Страница 38: ...38 Parts Lists Parts List Electrical 1 19 24 25 30 31 32 Optional Optional...
Страница 39: ...Parts Lists 39...
Страница 43: ...Parts Lists 43 Side Belts...
Страница 46: ...46 Parts Lists Vertical Column with Height Adjustment...
Страница 51: ...Parts Lists 51 Machine Body...
Страница 53: ...Parts Lists 53 Infeed Index Roller Table...
Страница 55: ...Parts Lists 55 Options...
Страница 57: ...Appendix A Electrical Schematic 57 Appendix A Electrical Schematic...
Страница 58: ...58 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 59: ...Appendix A Electrical Schematic 59 Electrical Schematic Continued...
Страница 60: ...60 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 61: ...Appendix A Electrical Schematic 61 Electrical Schematic Continued...
Страница 62: ...62 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 66: ......
Страница 67: ......