![Eastey SB-2EX-Auto Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/eastey/sb-2ex-auto/sb-2ex-auto_user-manual_3503037018.webp)
18 Operation
Operation
Loading the Tape Cartridges
Turn the main power switch to “Off” and disconnect the power.
CAUTION!
To avoid personal injury, remove the tape cartridge before
loading tape.
When handling the tape cartridge be careful to avoid contact
with the tape cutting blade.
After the taping cartridge has been removed push the tape roll onto the tape core
assembly.
NOTE: Make sure the tape roll is pushed all the way on the spindle
assembly.
Tape Roll
Tape Core
Spindle
Adhesive Side
Содержание SB-2EX-Auto
Страница 1: ...SB 2 3EX Auto Automatic Case Taping System User Guide...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 Installation Air Supply Line In Air In...
Страница 38: ...38 Parts Lists Parts List Electrical 1 19 24 25 30 31 32 Optional Optional...
Страница 39: ...Parts Lists 39...
Страница 43: ...Parts Lists 43 Side Belts...
Страница 46: ...46 Parts Lists Vertical Column with Height Adjustment...
Страница 51: ...Parts Lists 51 Machine Body...
Страница 53: ...Parts Lists 53 Infeed Index Roller Table...
Страница 55: ...Parts Lists 55 Options...
Страница 57: ...Appendix A Electrical Schematic 57 Appendix A Electrical Schematic...
Страница 58: ...58 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 59: ...Appendix A Electrical Schematic 59 Electrical Schematic Continued...
Страница 60: ...60 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 61: ...Appendix A Electrical Schematic 61 Electrical Schematic Continued...
Страница 62: ...62 Appendix A Electrical Schematic Electrical Schematic Continued...
Страница 66: ......
Страница 67: ......