Main Power Disconnect
Power
— The power disconnect switch is the lever with the
orange handle on the right side of the electrical box in the
base frame below the tunnel
•
Lifting the lever to the On position turns on (connects)
the system power necessary to power the Eastey
Bundling Tunnel.
•
Pushing the lever down to the Off position cuts
(disconnects) all power to the system.
Note:
See the Special Notes About the
Bundling
Tunnel Shutdown
Sequence, later in this section.
Control Panel
The control panel contains controls for the conveyor speed, heater bank on or off, and
blower speed, all in a central location. It is located on the side of the tunnel near the top
of the unit.
1.
Conveyor Speed
— Speed setting dial control for controlling speed of the
conveyor.
2.
Heater On-Off Switch
— Toggle switch for turning the heater bank on or off.
3.
Blower Speed Control
— Speed setting control for blower speed.
0
10
20
30
40
50
60
70
80
90
100
0
10
20
30
40
50
60
70
80
90
100
BLOWER SPEED
CONVEYOR SPEED
FOR COOL DOWN
HEATER BANK
TURN OFF HEATER BANK
PV
SV
SV2
AT
OUT
EV1
EV2
1
3
4
2
ON
OFF