-6-
Fig. 2.3.2 3U 1.5KVA-3KVA rack rear panel
Description of rear panel
a) Fan and fan guard
b) Output power supply socket
c) AC over-current protector
d) IEC Input socket
e) Communication interface (standard configuration USB+RJ45)
f) SNMP card slot
g) External battery connector
2.4 Product installation instructions
2.4.1 Installation attentions
1. Put UPS in a well-ventilated place and ensure the heat emission holes and fan
peripherals of the chassis meet the ventilation conditions at a distance of
150mm above and keep away from water, combustible gases and corrosives.
2. Turn off the devices which need uninterrupted power supply (such as host
computer), disconnect the power cord from the utility power socket and connect
it to the output socket of UPS connect the devices which do not need to be
connected with UPS to the common utility power socket.
3. Put UPS input plug into the utility power socket (ensure the zero wire and live
wire are correct and the ground wire is good).
4. The ambient temperature of UPS shall be kept between 0
℃
and 40
℃
.
-7-
5. It is recommended to charge the battery for 8 hours before using it. UPS will
charge the battery automatically as long as the input utility power meeting
requirements is connected to the host.
6. For the extended runtime model, connect the battery first after confirming the
battery wires, and then connect the utility power line.
15cm
OF F
ON
TEST /MUTE
15cm
Fig. 2.4.1 Installation attentions
2.4.2 Battery installation attentions for extended runtime model
Warning:
In order to ensure the safety of equipment and personnel, theinstallation must be
carried out by professionals.
1. First connect the battery bank with accompanied battery connecting wires (note
the red wire shall be connected to the anode, and the black wire shall be
connected to the cathode).
2. Confirm the connection of the battery bank. Measure the identification of the
battery input socket and the positive and negative of battery wire terminals of
UPS with a multimeter. The voltage shall be consistent with UPS’s input DC
voltage.
3. Be sure to check whether the installation is correct or not after it is completed.
Fig. 2.4.2 Schematic diagram of DC24V tower battery connection