background image

10

  [email protected]

1-833-327-8625

11

EASTOAK.COM

DECK BOX

12

Assemble the Reinforced Bridge P to the Lid Panel.

13

Please install Lock Bracket-1 G to Lid Panel.

11

Connect Lid Panel F to Lid Panel J.

(X1)

J

CLICK

(X1)

P

1

1

2

2

Please insert the grooved part 

of Reinforced Bridge P into the 

Panel first.

Reinforce the Lid Panel Reinforced 

Bridge with crews

Clamping ring installation 

To press the other end into the 

upper cover board 

For easier installation, Plastic Hinge E 

should tilt to one side, then to the other

(X2)

(X1)

E

G

G

(X5)

M

E

E

Содержание DB23003

Страница 1: ...1 EASTOAK COM DECK BOX 150 Gallon Deck Box Owner s Manual MODEL DB23003...

Страница 2: ...CK BOX Claim your 3 year warranty at eastoak com warranty Questions Comments Reach out us for expert support support eastoak com eastoak com 1 833 EAST OAK USA 1 833 327 8625 Follow eastoakliving on P...

Страница 3: ...d then tighten the screws after they are all positioned Check all panels for tightness before usage It is of utmost importance to assemble all parts according to the directions Do not skip any step In...

Страница 4: ...Panels A Align 2 Rubber Plugs Q with the hole and install it on Bottom Panel C The letter marks on the A A Logo B C F J panels should face inward when installing 3 Install 2 Panels A without logo Ins...

Страница 5: ...tions of the arrows on Panel A and B are consistent Please install 2 Plastic Strips T and Lock Bracket 2 I to Panel A with logo with 5 Screws 5 Put the assembled Side Panel A on the flat ground and th...

Страница 6: ...out of the buckle position and then pull the front and rear side panels slightly to take it out 10 Please install the Lid Conecters G1 G2 and 2 Reinforced Metal Rods D to Lid Panel F 9 Gently pull the...

Страница 7: ...Connect Lid Panel F to Lid Panel J X1 J CLICK X1 P 1 1 2 2 Please insert the grooved part of Reinforced Bridge P into the Panel first Reinforce the Lid Panel Reinforced Bridge with crews Clamping ring...

Страница 8: ...EASTOAK COM DECK BOX 15 Assemble 2 Hydraulic Rods H1 to Side Panel B with 6 Screws 16 17 Tighten Plastic Hinge E with 8 Screws Installation completed 14 Assemble 2 Hydraulic Rods H1 to Lid Panel with...

Страница 9: ...d Bridge 4 Reinforced Metal Rods 2 Hydraulic Rods Screw Package User Manual Padlock FEATURES WHAT S IN THE BOX CALIFORNIA PROP 65 WARNING WARRANTY POLICY GUARANTEED 3 YEAR WARRANTY Thank you for choos...

Страница 10: ...16 SUPPORT EASTOAK COM 1 833 327 8625 support eastoak com eastoak com 1 833 EAST OAK USA...

Отзывы: