background image

11

Easee public knowledge base can be found at 

easee.support

.

Charging Robot interface

Light description

Status

White – constant light, only at the bottom 
2 LEDs – master unit / 1 LED – secondary units

Standby

White – constant light

Car connected

White – pulsating light

Charging in progress

Blue – constant light

Smart charging enabled (car connected)

Blue – pulsating light

Smart charging in progress

At startup, the LEDs turn on one by one. 
When the charger is updating, one or more 

LEDs will flash green while this is in progress.

Updating software (updating can take up to 30 minutes)

NOTICE!

 The car must be disconnected before a software update 

can be completed.

White – flashing light

Waiting for authentication by an RFID tag. Hold the RFID 

tag against the RFID area of the Charging Robot in order to 

authenticate and initiate the charging.

White – fast flashing light

RFID-tag received (awaiting key verification)

Red – constant light

General error. Unplug the charging cable and replug it to the 

Charging Robot. If the red light persists, check the Easee app or our 

knowledge base

1

 for further information.

Red – constant light, with warning sounds

Wires are connected incorrectly. Consult an authorised electrician.

Red – pulsating light

The Charging Robot has measured an abnormal temperature and 

has entered in safe mode. Please go to our knowledge base

1

 for 

further information.

White – flashing light, only at the bottom

The Charging Robot is searching for its master unit. Please check 

the status of the master unit. For further information, please check 

our knowledge base

1

.

Yellow – flashing light, only at the bottom

The Charging Robot is waiting to be configured. Consult an 

authorised electrician.

Содержание Plug and Play

Страница 1: ...Easee Plug Play User installation guide...

Страница 2: ...ty Safety instructions Installation Installation instructions Daily use and operation How do I charge Apps and interfaces Charging Robot interface Maintenance Practical details 3 3 4 5 6 7 10 10 11 12...

Страница 3: ...t load bearing capacity It may only be operated with the approved operating parameters and under the specified environmental conditions see page 5 Uses other than those specified here are not permitte...

Страница 4: ...ons 2 Light strip The light strip communicates the status of the Charging Robot at all times Read more about this on page 11 3 RFID area The integrated RFID reader enables access control of the Chargi...

Страница 5: ...meter 2 Easee Home Load balancing of up to 3 units per circuit Easee Charge Load balancing of up to 101 units per circuit Sensors and indicators Light strip with LEDs showing the status of the charge...

Страница 6: ...n the product lights up red there is a fault For more information see page 11 Make sure that children do not play with the product Never touch the contacts of the Type 2 socket and never insert foreig...

Страница 7: ...careful and follow the instructions Installation instructions 1 Unscrew the locking screw at the bottom of the Easee Ready 2 Insert the two ends of the included tool into the two openings at the bott...

Страница 8: ...e 3 When the Chargeberry is in the track press it forcefully down until you hear a click 4 Paste the PIN code sticker on the back of the manual or in another safe location e g inside of the fuse cabin...

Страница 9: ...1 Hang the front cover at the top of the backplate and let it fall into place 2 Press the bottom of the front cover until you hear a click 3 Bend the lower part of the rubber cover down 4 Screw in the...

Страница 10: ...might be the cause on page 11 Smart charging Some operators offer smart charging which will delay charging to a suitable point in time often tied to electricity price or similar mechanisms When Smart...

Страница 11: ...nst the RFID area of the Charging Robot in order to authenticate and initiate the charging White fast flashing light RFID tag received awaiting key verification Red constant light General error Unplug...

Страница 12: ...uit insulation with the Chargeberry installed in the backplate may damage the electronics or impact the reading negatively Maintenance Practical details Warranty The device is free from material defec...

Страница 13: ...be isolated before dismounting starts Use the installation guide and follow the steps in reverse in order to dismount the Charging Robot in the correct order Disposal This electronic equipment must no...

Страница 14: ...ding retrieving data or computer networks without the written permission of Easee AS Easee and all other Easee product names and slogans are trademarks or registered trademarks of Easee AS Easee produ...

Страница 15: ...15...

Страница 16: ...16 Easee AS Grenseveien 19 4313 Sandnes Norway easee com...

Отзывы: