65 lb. Professional
Ice Melt Spreader
MODEL # 90365
ASSEMBLY INSTRUCTIONS
90365 65lb Ice Melt Spreader_M53107_113020
PAGE 3
Step 5:
Install handle shaft to lower handles and pivot & bracket assembly as shown
using 2” bolts and locknuts.
TIGHTEN BOLTS AND NUTS NOW.
Step 6:
(This step is only required if you want to change the position
of the handles).
NOTE:
BEFORE INSTALLING GAUGE AND UPPER
HANDLES TO HANDLE SHAFT, UPPER HANDLES FEATURE THREE
POSITONS FOR OPERATOR’S COMFORT. If operator chooses middle
or upper positions, use handle spacer in hole nearest to handle
grips.
Insert 2” bolt through upper handle, then throu
gh handle spacer
through other upper handle and secure with locknut.
DO NOT
TIGHTEN LOCKNUT YET. TIGHTEN THIS NUT LAST.
Now slide the
UPPER HANDLE
assembly over the
HANDLE SHAFT
(on the end with the bolt holes closer to the
end)
. Install gauge & lever using (2) 2” bolts. Be
sure gauge is on left hand side. Tighten locknuts
to gauge first.
TIGHTEN ALL HARDWARE NOW.
Step 7:
Install Control Rod by inserting flattened
end of Control Rod into Lever on Gauge as
shown. Turn to lock in place.
{Make sure that
there is a plain ¼ -20 Hex Nut threaded about
halfway up the threads}.
Push lever forward to full OPEN setting. Align
and push the Control Rod through the angle attached to the Pivot
Bracket. Now install ¼ -20 regular nut on to Control Rod
. {One
nut on either side of the angled plate}
.
Next pull pivot & bracket back so that the shut off plate in the
hopper is in the full open position and adjust the Hex Nuts on the
Pivot Bracket angle
to secure the angled bracket. Now tighten the
nuts against the pivot angled bracket to prevent change in
calibration.