![EarthWay 2170 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/earthway/2170/2170_operating-instructions-manual_3405325003.webp)
Bushing
Bushing
Install the axle
as shown above
7.
Slide axle bushing over axle and into axle bearing to both sides as shown.
8.
Install drive wheel onto the axle and align with the cotter pin hole nearest to
lower handles as shown. Insert 2” cotter pin through wheel and through axle.
Bend with pliers to prevent pin from falling out.
9.
Install coast wheel onto the axle fully, then using outside cotter pin hole,
insert 1” cotter pin through axle
(not thru the wheel).
Bend with pliers to
prevent pin from falling out.
Coast wheel side
1” Cotter Pin
Drive wheel side
2” Cotter Pin
TURN SPREADER UPRIGHT ON TO WHEELS.
1/4-20 x 2”
Hex Head
Bolt
Gauge &
Lever Assembly
Upper Handles
1/4-20
Locknuts
Handle Shaft
Long end
Shut-Off
Plate
Pivot Rod
with extra bend
Rotate
Pivot
PAGE 3
Insert Pivot Rod
into Shut-Off
and rotate to secure
Angle
Attaching
Arm
Pivot
Rod
10.
Insert 2” bolt through Gauge & Lever assembly, next through upper handle,
then the handle shaft and then the other upper handle and secure with locknut.
TIGHTEN ALL HARDWARE NOW
11.
Insert pivot rod into shut-off plate as shown.
Turn to lock in place.
12.
Insert other end of pivot rod into pivot and bracket assembly as shown. Turn
to lock in place.