
EARTHSTONE OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS---
2
PRE-ASSEMBLED INSTALLATION INSTRUCTION GUIDE
READ ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING AND USING THE APPLIANCE
.
If this oven is not properly installed, a fire may result. To reduce the risk of fire, follow the installation
instructions. Please read this entire manual before you install the oven. Failure to follow instructions
may result in property damage, bodily injury, or even death.
The installer should contact the local building or fire officials concerning any installation restrictions and
the need for inspection(s) of the oven and venting applications before beginning installation.
Obtain the necessary permit to construct. In most areas this will include a permit to construct the oven
and a permit for the exhaust system. Sometimes an electrical permit is also necessary for connecting
the exhaust fan. All construction must comply with local building codes. There are some portions of
these instructions which are more restrictive than the building codes. Whichever is most restrictive must
be followed.
The diagram below indicates the minimum floor space required.
(ALL DIMENSIONS ARE TO OUTSIDE FACE OF STEEL ENCLOSURE)
“A”
“B
”
OUTSIDE DIMENSION
S
Model
90-Due 60" (A) x 44" (B) 4,000 lbs
110-Due’ 96.25” (A) x 54.25” (B) 5,000 lbs
Model 130-Due’ 116.25” (A) x 66.25” (B) 8,000 lbs.
IMPORTANT REMINDER
After reading this installation guide it is important to determine which venting application method will be
used.
Most cities accept the U.L. listed chimney installation (direct venting) however a few cities will require the
use of a Type I grease hood over the oven opening. Check with your local building department to
determine which is acceptable.
To maintain the listing of the oven the venting application needs to be installed in accordance with the
guidelines specified in this installation instruction guide.
SAVE THESE INSTRUCTIONS
Содержание 130-DUE-PA
Страница 10: ......