Operator's Manual
Trail Warrior Quick Split 12-Ton Log Splitters
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
12
aSSEMBLy
Tools needed - one 16mm combination wrench, one 17mm
combination wrench, two 13mm wrenches, one flat screw-
driver, one pair of pliers, one 10” adjustable wrench, one snap
ring tool, one pipe wrench and one rubber mallet.
NOTE: Each log splitter was partially assembled at the fac-
tory. Refer to the parts diagram for detailed assembly.
1. Remove locking pin from outer telescopic tongue axle as-
sembly. Lock front upright in the up position with locking
pin already installed in upright. SEE FIGURE 1.
2. Slide inner hitch assembly into outer telescopic tongue/axle
assembly. Replace locking pin in 3
rd
hole. SEE FIGURE 2.
WaRNING
REaD aND UNDERSTaND aLL aSSEMBLy, SaFETy, &
MaINTENaNCE INSTRUCTIONS PROVIDED BEFORE
EaCH USE.
BECOME FaMILIaR WITH yOUR LOG SPLITTER FOR
yOUR OWN SaFETy. FaILURE TO DO SO May CaUSE
SERIOUS INJURy aND/OR DEaTH.
DO NOT aLLOW aNyONE TO OPERaTE yOUR LOG
SPLITTER WHO HaS NOT REaD THIS MaNUaL. REaD
EaCH STEP COMPLETELy BEFORE PROCEEDING.
aLWayS WEaR SaFETy GLaSSES DURING OPERaTION.
aLWayS WEaR STEEL TOE BOOTS DURING aSSEMBLy.
DO NOT STaRT OR RUN THE ENGINE WITHOUT OIL IN
THE HyDRaULIC RESERVOIR aND ENGINE.
Figure 1
Figure 2
WaRNING
THIS MaCHINE IS FOR ONE-PERSON OPERaTION ONLy