SCWD-QS (12/16)
Page 3
List of Figures
Figure 1. Matching Component Model Numbers .................................................................................. 7
Figure 2. General Layout of System Components .............................................................................. 8
Figure 3. Compressor Unit Clearance .................................................................................................. 9
Figure 4. SCWD Connections ............................................................................................................ 10
Figure 5. Line Set Sizes ..................................................................................................................... 12
Figure 6. SCWD Electric Box Components & Electrical Data ............................................................. 14
Figure 7. SCWD Compressor Unit Electrical Schematic Diagram, 230-1-60 ...................................... 15
Figure 8. SCWD Compressor Unit Electrical Schematic Diagram, 230-3-60 ...................................... 16
Figure 9. SCWD Hydronic Heating/Cooling/Water Heating Sytem Application ................................... 17
Figure 10. SCWD Hydronic Heating/Cooling/Water Heating System Field Wiring Diagram ............... 18
Figure 11. SureStart Mode of Operation ............................................................................................ 20
Figure 12a. Typical SCWD Primary Hydronic Circuit Plumbing .......................................................... 23
Figure 12b. Standard Storage Water Heater
—Service Connections .................................................. 27
Figure 12c. GSTE Storage Water Heater
—Service Connections ....................................................... 28
Figure 12d. GSTE Storage Water Heater
—Tank Top View ............................................................... 28
Figure 13. Compressor Cabinet Socket/Cap ..................................................................................... 30
Figure 14. Disassembled Plug Connector ......................................................................................... 31
Figure 15. Anode Wire Insertion ....................................................................................................... 32
Figure 16. Install the Plug Insert ....................................................................................................... 33
Figure 17. Engage the Gland Nut ..................................................................................................... 33
Figure 18. Secure the Anode Wire. ................................................................................................... 34
Figure 19. The Plug and Socket Joint ............................................................................................... 34
Figure 20. Electric Box with EPS Components ................................................................................. 35
Figure 21. EPS Voltage Ratings ....................................................................................................... 36
Figure 22. Typical Test for DC Voltage ............................................................................................. 36
Figure 23. SCWD Internal Flow Schematic ........................................................................................ 38
Figure 24. SCWD Piping .................................................................................................................... 39
Figure 25. Evacuation of SCWD System ........................................................................................... 41
Figure 26. Initial Charge of SCWD System ........................................................................................ 43
Figure 27. Final Charge of SCWD System ........................................................................................ 45
Figure 28. Charging to the Middle Sight Glass (Heat only units) ....................................................... 46
Figure 29. Final charging to the Top Sight Glass (Heat/Cool units) ................................................... 46
Figure 30. Pressure-Temperature for R-410A .................................................................................... 47
Figure 31. Start-Up Process .............................................................................................................. 48
Figure 32. Compressor Unit Voltage Information .............................................................................. 50
Содержание SCWD-024-1C
Страница 15: ...SCWD QS 12 16 Page 15 Figure 7 SCWD Compressor Unit Electrical Schematic Diagram 230 1 60...
Страница 16: ...SCWD QS 12 16 Page 16 Figure 8 SCWD Compressor Unit Electrical Schematic Diagram 230 3 60...
Страница 17: ...SCWD QS 12 16 Page 17 Figure 9 SCWD Hydronic Heating Cooling Water Heating Sytem Application...
Страница 18: ...SCWD QS 12 16 Page 18 Figure 10 SCWD Hydronic Heating Cooling Water Heating System Field Wiring Diagram...
Страница 20: ...SCWD QS 12 16 Page 20 Figure 11 SureStart Mode of Operation...
Страница 31: ...SCWD QS 12 16 Page 31 Figure 14 Disassembled Plug Connector...
Страница 38: ...SCWD QS 12 16 Page 38 Figure 23 SCWD Internal Flow Schematic...
Страница 39: ...SCWD QS 12 16 Page 39 Figure 24 SCWD Piping...
Страница 41: ...SCWD QS 12 16 Page 41 Figure 25 Evacuation of SCWD System...
Страница 43: ...SCWD QS 12 16 Page 43 Figure 26 Initial Charge of SCWD System...
Страница 45: ...SCWD QS 12 16 Page 45 Figure 27 Final Charge of SCWD System...
Страница 48: ...SCWD QS 12 16 Page 48 Figure 31 Start Up Process...
Страница 60: ...SCWD QS 12 16 Page 60 Figure A1 SCWD Compressor Unit Electrical Schematic Diagram No SureStart 230 1 60...
Страница 61: ...SCWD QS 12 16 Page 61 Figure A2 SCWD Compressor Unit Electrical Schematic Diagram No SureStart 230 3 60...