   Installation – Refrigerant Connections 

Figure 2. Auxiliary Cooling Module Refrigerant Connections 

The Auxiliary Cooling Module has two refrigerant connections on the service side of the unit as 
shown in Figure 2. The connections are the same size as each other. These sizes are listed in 
Figure 2 for each Auxiliary Cooling Module model. Each connection is identified with a label saying 
“To compressor” or “To earth loops”. 

 

The refrigerant connections have caps brazed on at the factory. They should be un-brazed at the 
time that tubing is to be connected to the Auxiliary Cooling Module. 

After locating the Auxiliary Cooling Module as noted earlier, a trench 3 to 4 Feet deep is to be 
excavated running from the Auxiliary Cooling Module to the earth loop line set. If the lines to and 
from the Auxiliary Cooling Module are to be run parallel to and within 10 Feet of the building 
foundation or basement wall, both lines are to be insulated with ½” wall thickness Armaflex

®

 or 

InsulTube

®

 tubing insulation, cased within a 4” PVC pipe. The PVC pipe must be a minimum of 3 

Feet from the building foundation or wall. This is illustrated for a typical application in Figure 3. 

Содержание ACM-024C

Страница 1: ...12 Earthlinked Technologies Inc EarthLinked Auxiliary Cooling Module Models ACM 024C thru ACM 072C For R 410A Installation Manual CONTENTS PAGE Pre Installation 3 Installation 5 Placement 5 Refrigeran...

Страница 2: ...e with the instructions set forth within this manual Failure to provide installation by an authorized trained installer in a manner consistent with this manual will void the limited warranty coverage...

Страница 3: ...of the system The table below lists the properly matched EarthLinked Auxiliary Cooling Module models with EarthLinked compressor unit models Application of the Auxiliary Cooling Module ACM to R 410A s...

Страница 4: ...t Dimensions Full Load Amps Rated HP Nominal RPM Width inches Depth inches Height inches ACM 024C 230 1 60 207 253 0 9 5 0 0 7 1 10 1010 24 25 24 25 24 50 ACM 036C 230 1 60 207 253 0 9 5 0 0 7 1 10 10...

Страница 5: ...1 Auxiliary Cooling Module Placement in EarthLinked System Location Requirements for the Auxiliary Cooling Module 1 Within 40 Feet of the earth loop line set Minimize refrigerant line lengths 2 Highe...

Страница 6: ...ate the Auxiliary Cooling Module per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate water drainage of Auxiliary Cooling Module Use snow sta...

Страница 7: ...at the factory They should be un brazed at the time that tubing is to be connected to the Auxiliary Cooling Module After locating the Auxiliary Cooling Module as noted earlier a trench 3 to 4 Feet de...

Страница 8: ...12 Page 8 Figure 3 Auxiliary Cooling Module Refrigerant Piping A top view of typical Auxiliary Cooling Module and line set vapor line connections are illustrated in Figure 4 Figure 4 Top View of Line...

Страница 9: ...refrigerant piping connections This process eliminates oxidation products from inside joint surfaces TECHNIQUE Trickle nitrogen gas at 1 2 psi pressure through the joint area being brazed to displace...

Страница 10: ...ropriate breakers remove the front and top panels of the compressor unit cabinet 2 Reference Figure 5 for compressor unit electrical box Remove available hole covers from the front of the electrical b...

Страница 11: ...older and tighten the other terminal screw of the terminal block onto the stripped end of the gray wire 9 Run high voltage wiring from the two pole terminal strip in the electrical box out of the grom...

Страница 12: ...ng Module Field Wiring 12 Check all wiring and electrical connections to ensure proper routing and good contact before restoring electric power evacuating and recharging system in accordance with the...

Отзывы: