
Assembly Illustrations Optional Base
1. Float the Base Plate in a bed of Earthcore mortar on a flat, even
surface which is suitable to hold the entire weight of the finished
appliance.
2. Set the side wall and back walls on to the base plate and secure
with Earthcore mortar; at each course, checking to ensure level.
3. After all sidewalls and back walls are in place, check for level
and plumb as needed.
4. The rear base support beam should be set angled side in, flush
against the back walls of the base unit secured with Earthcore
mortar.
5. The support side walls should be placed flush with exterior of
side walls and mortared into place with Earthcore mortar.
6. Notch out a section from the top forward section of the
uppermost sidewall (both sides) to accommodate the steel lentil.
A