EarthCore ISO'ven Скачать руководство пользователя страница 13

Assembly Illustrations Optional Base

1. Float the Base Plate in a bed of Earthcore mortar on a flat, even 

surface which is suitable to hold the entire weight of the finished 

appliance. 

2. Set the side wall and back walls on to the base plate and secure 
with Earthcore mortar; at each course, checking to ensure level.

3. After all sidewalls and back walls are in place, check for level 
and plumb as needed. 

4. The rear base support beam should be set angled side in, flush 

against the back walls of the base unit secured with Earthcore 
mortar.

5. The support side walls should be placed flush with exterior of 

side walls and mortared into place with Earthcore mortar. 

6. Notch out a section from the top forward section of the 
uppermost sidewall (both sides) to accommodate the steel lentil.

A

Содержание ISO'ven

Страница 1: ...oduct It is the responsibility of the installer of this product to ensure that the instructions in this manual are followed exactly It is the responsibility of the general con tractor and installer to...

Страница 2: ...ven Wood FiredOven components will be described and illustrated in the following pages Close attention should be paid to each component group s specifications and installation requirements as describ...

Страница 3: ...kind or nature whether foreseeable or not based on any claim by any party as to the modifications of the ISO ven Wood Fired Oven 10 Never leave children unattended when there is a fire burning in the...

Страница 4: ...ISO 03 D FRONT WALL LINER FRONT WALL LINER 53 4 13 20 1 0 5 1 1 20 1 0 70 1 1 ISO 06 ISO 01 A 1 1 33 1 4 33 1 4 SHELVES 25 1 4 x 34 1 4 B TOP PLATE 21 34 With ISO ven 2 Only ISO 02 28 x 34 1 4 B 25 1...

Страница 5: ...urfaces of the vertical joints where the side wall and back wall components connect Step 3 Continue assembly of the second and third courses of the storage base side wall and back wall Apply mortar to...

Страница 6: ...that it sits on Figure 5 It is necessary to place a steel angle supplied by the customer minimum 4 x 4 x 3 8 across the front face of the two sided opening before building the oven assembly Figure 4...

Страница 7: ...t the back wall inner liner Figure 8 There is no need to mortar brick in place Butt brick tightly against each other and back wall liner Step 11 Run a bead of high temperature caulking along the outsi...

Страница 8: ...ther using the appropriate layout shown in Figure 9 Do not mortar firebrick to floor of oven or to each other Place a small amount of mortar under outside bricks to hold in place Step 14 Caulk front w...

Страница 9: ...ieve The tip of the probe should either penetrate the oven slightly or penetrate the liner of the ISO ven Use the shorter stem for thin exterior facing applications such as stucco Use the longer stem...

Страница 10: ...en toward the rear of the oven while continung to feed the flames When the temperature of 600 700 degrees is reached use a hoe or paddle to rake all the coals together to one side of your oven either...

Страница 11: ...fect ISOKERN or any division thereof is not responsible for any labor costs or indirect costs incurred for the replacement of defective components ISOKERN is not responsible for misuse or mishandling...

Страница 12: ...e Graphic A PRODUCT OF EARTHCORE INDUSTRIES THIS Wood Fired Oven Is Designed for Outdoor Use Only with SOLID WOOD LOGS FOR OUTDOOR USE ONLY 2007 Earthcore Industries L L C ISO ven 1 TABLE TOP ISO ven...

Страница 13: ...hecking to ensure level 3 After all sidewalls and back walls are in place check for level and plumb as needed 4 The rear base support beam should be set angled side in flush against the back walls of...

Страница 14: ...Built By Others This base should be a minimum 35 deep to support ISO ven 2 Mortar Isokern back wall to shelf so Isokern back wall is flush with back of shelf Cut inswool blanket to fit inside Isokern...

Страница 15: ...as shown Do not glue inswool to oven liner front 8 Lay Isokern front wall up against inswool covering the oven liner front wall and mortar to the Isokern shelf pieces Do not mortar to the inswool 9 P...

Страница 16: ...d in oven liner wall Mortar temperature gauge into place D NOTE Do not mortar or glue any of the inswool pieces to any part of the oven liner or the Isokern components Allow your oven to sit in a dry...

Отзывы: