background image

7

TAKE DOWN THE GREENHOUSE

Step 8

 Pull up all stakes from the ground.

 Press the push pin on each leg and retract the legs to their original height.

 Push the push button on each slider to unlock the frame.

 Take off the PE top, lift one corner of the frame until all legs are raised off the ground

      except for the 1 leg on the opposite corner. Push inward until the frame is fully closed.

Содержание 6ftx4ft Foldable Greenhouse Canopy

Страница 1: ...Eagle Peak 6ft x 4ft Foldable Greenhouse Canopy INSTRUCTION MANUAL Thank you for choosing Eagle Peak ...

Страница 2: ...ate of original purchase This warranty does not cover any product purchased through non authorized dealers and or online auction websites This warranty shall be void as to any product which has been altered or modified in any manner Global Shade Corporation does not warrant against and under no circumstances shall Global Shade Corporation be liable or responsible for any personal loss injury or di...

Страница 3: ...TTACH THE PE TOP Lift and partially pull the frame apart Unfold the PE top unzip the door and place on top of the frame Avoid the peak cap hooking the lining of the PE top Secure the PE top to the corners of the frame using Velcro connections Unzip Velcro ...

Страница 4: ...e slider while holding down on the top of the leg The slider will automatically lock when it reaches the hole in the upper leg LOCK THE FRAME ADJUST THE GREENHOUSE HEIGHT Press the push pin on each leg and raise or lower to adjust the greenhouse height 85 85 Click ...

Страница 5: ...4 SET UP THE GREENHOUSE Step 5 VELCRO CONNECTION Velcro Velcro Secure the PE top to the legs of the frame using the Velcro connections ...

Страница 6: ...eg Insert stakes into the loops at bottom of sidewall Tie four ropes to the corners of the top fabric Measure out from the each leg to a proper distance and secure eight stakes to the ground Tie the ropes to the stakes in the ground Ensure the rope has the proper tension by adjusting the plastic adjusters on the ropes X2 X4 loop X4 ...

Страница 7: ...ROLL UP THE DOOR AND THE CURTAIN Roll up the door and the curtains if necessary 6 SET UP THE GREENHOUSE Step 7 ...

Страница 8: ...n each leg and retract the legs to their original height Push the push button on each slider to unlock the frame Take off the PE top lift one corner of the frame until all legs are raised off the ground except for the 1 leg on the opposite corner Push inward until the frame is fully closed ...

Страница 9: ...10 14 15 16 1 9 14 15 16 8 7 12 11 11 12 12 10 Central Cap Eave Assembly Entry Side Eave Assembly Ceiling Assembly Plastic Board Left Leg Assembly Right Leg Assembly Top With Sidewall Stake Rope To inquire about replacement parts please contact Eagle Peak through the website ...

Страница 10: ......

Отзывы: