![background image](http://html.mh-extra.com/html/eagle-group/a201604/a201604_assembly-instructions_520208004.webp)
ASSEMBLY INSTRUCTIONS
Inhalation Therapy Cart
(End)
truss frames
cylinder
rack
matt
cylinder rack
truss frame
Step 7 - Snap cylinder rack matt to each truss frame.
“U” handles/legs
caster
stem
donut
bumper
caster
stem
donut
bumper
• Place donut bumpers onto ends of “U” handles/legs.
• Place caster stems into bottom of “U” handles/legs and drive caster using a
hammer or mallet (several solid blows are usually required).
Step 6 - Secure casters to unit.
Eagle Foodservice Equipment, Eagle MHC, SpecFAB, and Retail Display are divisions of Eagle Group. ©2007 by the Eagle Group
• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com
• Phone: 302/653-3000 • (Foodservice) 800/441-8440 • (MHC/Retail) 800/637-5100
• Fax: 302/653-2065