BMS-icom Installation Manual
7
(1) Prepare for Connection
1. Organize clamps based on type and verify that all clamps are present
2. Ensure all intercell connections are secure and torqued to spec
(2) Connection of Clamps (C-Type)
1. Place the clamp in the center of the bus-bar and tighten down using the provided
screws
2. If the bus-bar has a cover, cut out an area so the cover sits snugly against the clamp
3. Attach additional clamps, be sure all clamps are facing the same direction
C-Clamp on Busbar
(3) Connection of Clamps (O-Type)
1. Place clamp in center of cable and tighten sensing screw into the cable
2. Ensure that the screw has penetrated sufficiently into the cable
NOTE:
If the cable is too large for the clamp it can cut down to accommodate the
size
3. Attach additional clamps, be sure all clamps are facing the same direction
Breaking Points