S/N
Components
Methods
Period
12
Self-locking nut
Check with torque spanner. The torque should be no less than
330N.m.
Every 3 months
13
Whole Lift
Running the lift for several cycles with and without rated load.
The lift can run steadily and smoothly with no abnormal noise.
Every 3 months
14
Hydraulic oil
Change the oil 6 months after initial use and once per year
thereafter. Inspect the hydraulic oil and change the oil if the
oil becomes black or there is dirt in the oil tank.
Every year
If users stick to the above maintenance requirements, the lift will always keep a good working condition
and its service life could be extended.
Annex 1, Floor plan for fixed installation
Indoor installation only.
There must also be a clearance of at least 1 meter between the lifting platform and fixed elements (e.g. wall) in all lifting positions. There
must be sufficient space for driving vehicles on and off.
C25/30 concrete base with a minimum thickness of 150mm.
Surface: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
All dimensions are in millimeters.
Содержание EE-MR30
Страница 10: ...Installation Operation and Parts Manual EE MR30 10 3 3 Dimensions...
Страница 24: ...Installation Operation and Parts Manual EE MR30 24...
Страница 25: ...Installation Operation and Parts Manual EE MR30 25...
Страница 32: ...Installation Operation and Parts Manual EE MR30 32...
Страница 34: ...Installation Operation and Parts Manual EE MR30 34...