Installation, Operation and Parts Manual
EE-6605S/A/B
12
4.1.5
Checking
parts
Unfold
the
package
and
check
if
any
parts
missed
as
per
the
following
list.
Do
not
hesitate
to
contact
us
in
case
any
parts
missed,
but
if
you
do
not
contact
us
and
insist
installing
upon
the
lack
of
some
parts,
we
as
well
as
our
dealers
will
not
bear
any
responsibility
for
this
and
will
charge
for
any
parts
subsequently
demanded
by
the
buyer.
No.
Name
Specification
Qty
1
Power
side
lifting
platform
assembly
1
2
Secondary
lifting
platform
assembly
1
3
Control
cabinet
3.5KW/3PH
1
4
Expansion
bolt
M18*160
16
5
Air
hose
D=8
2m
6
Air
hose
connector
PP
‐
20
5*8
1
7
User's
Manual
1
8
Key
1
4.2
Installation
attentions
4.2.1
Joints
of
oil
hose
and
wiring
must
be
well
connected
in
order
to
avoid
leakage
of
oil
hose
and
looseness
of
electrical
wires.
4.2.2
All
bolts
should
be
firmly
screwed
up.
4.2.3
Do
not
place
any
vehicle
on
the
lift
in
the
case
of
trial
running.
4.3
General
Installation
Steps
Step
1:
Dismantle
the
package
and
place
lifting
platforms
into
recessed
pits
with
a
forklift
and
lifting
straps.
Raise
the
platform
by
using
a
forklift
and
2
lifting
straps
until
the
mechanical
lock
is
engaged.
Dismantle
the
bolts
that
fix
the
platform
and
its
wooden
package
and
then
hoist
the
platform
onto
the
expected
installation
site.
Attention
1:
Avoid
scratching
the
painting
surface
and
hoses.
Attention
2:
Before
hoisting,
make
sure
the
hoses
and
wires
are
well
protected
against
damage.
Attention
3:
It
is
necessary
to
hold
the
platform
during
the
hoisting
process.
Irrelevant
person
is
not
allowed
in
installation
area.
Step
2:
Connect
hydraulic
system.
Connect
the
oil
hoses
to
the
power
unit
as
per
the
diagram
for
oil
hose
connection
in
Annex
3
.
Attention:
Connect
as
per
the
marks
on
the
hoses
and
do
not
contaminate
the
hydraulic
components
during
the
connection.
Step
3:
Connect
the
pneumatic
release
system
Connect
the
pneumatic
release
system
by
the
diagram
of
air
hose
connection
in
Annex
4
.
Attention:
Do
not
contaminate
the
pneumatic
components
during
the
connection.
Step
4:
Connect
electrical
wires.
Refer
to
Annex
2
when
fix
the
electrical
system.
Connect
the
wire
connectors
for
raising
and
lowering
limit
switches
Connect
the
power
supply
cable
to
external
electricity
supply.
(For
three
phase
power
supply,
if
the
lift
doesn't
raise
and
the
motor
may
turn
in
the
wrong
direction,
in
such
event,
interchange
wires
U,
V
in
the
control
cabinet).
Содержание EE-6605S
Страница 19: ...Installation Operation and Parts Manual EE 6605S A B 19 Floor plan for surface installation...
Страница 20: ...Installation Operation and Parts Manual EE 6605S A B 20 Annex 2 Electrical schemes and parts list...
Страница 21: ...Installation Operation and Parts Manual EE 6605S A B 21...
Страница 22: ...Installation Operation and Parts Manual EE 6605S A B 22...
Страница 23: ...Installation Operation and Parts Manual EE 6605S A B 23...