Installation, Operation and Parts Manual
EE-6435V2.S/EE-6435V2.B
20
Step 5: Connect posts and crossbeams.
1. Pull up the safety ladder from the post with its bottom end higher than the height of cross beam.
2. Pull the post to the cross beam as the direction arrow showed in the following drawing. Fasten the top end of safety ladders to the top plate
of each post.
3. Pull out the steel cables from both ends of the cross beam and fasten them on the top plate of post.
(Please see the Annex for the steel cable connection)
Содержание EE-6435V2.S
Страница 29: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 29 Annex 1 Steel cable connection...
Страница 30: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 30 Annex 2 Electrical schemes and parts list...
Страница 31: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 31...
Страница 32: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 32...
Страница 33: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 33...
Страница 38: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 38...
Страница 45: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 45...
Страница 48: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 48...
Страница 51: ......