Installation, Operation and Parts Manual
EE-6435V2.S/EE-6435V2.B
17
4.1.3 Foundations preparations
Indoor installation only.
There must also be a clearance of at least 0.6 meter between the lifting platform and fixed elements (e.g. wall) in all lifting positions.
There must be sufficient space for driving vehicles on and off.
C20/25 concrete base with strength more than 3000psi, Minimum thickness of 200mm.
Surface: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
In mm.
Runway length
L1
48L
4888mm
52L
5288mm
57L
5788mm
Width between columns
L2
2850mm
3310mm
3000mm
3460mm
Содержание EE-6435V2.S
Страница 29: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 29 Annex 1 Steel cable connection...
Страница 30: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 30 Annex 2 Electrical schemes and parts list...
Страница 31: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 31...
Страница 32: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 32...
Страница 33: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 33...
Страница 38: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 38...
Страница 45: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 45...
Страница 48: ...Installation Operation and Parts Manual EE 6435V2 S EE 6435V2 B 48...
Страница 51: ......