Use
This d
t and its contents are the property of CASSIDIAN
nd must not be copied or circul
7
1
2
3
4
5
3.2
INSTALLATION
This chapter describes the installation procedure for the IDR
IDO 3G.
Installation simply involves installing the rack on the site and commissioning it
(see Section 3.3.1).
The resources needed for the installation are just a standard tool case for mounting in a
cabinet.
The installation steps are described in the flowchart in Figure 3.1.
Figure 3.1
IDR IDO 3G INSTALLATION STEPS
Site radio engineering
(contact the
manufacturer's technical
assistance department).
Installation of the
IDR IDO 3G.
Connect the antenna,
earth and power supply
cables (Section 2.3.4.1
If used, connect the
remote alarm cable
(Section 2.3.4.3
Power up the
IDR IDO 3G
(Section 3.3.1.2).
Select the IDR IDO 3G
channel
(Section 3.3.1.3).
Select the transmission
level (Section 3.3.1.4).
Activate transmission
(Section 3.3.1.5).
End of installation
Check the site radio
engineering provisions.
Operational site
(common
installation)
IDR IDO 3G installer
Содержание CASSIDIAN IDR IDO 3G
Страница 5: ...DEFENDING WORLD SECURITY IDR IDO 3G Technical Manual TMO PS11209BENAB01 07 2012...
Страница 150: ...IDR IDO 3G_MC9_IDR IDO_FAV_PRES_01_01 3 1 2 4 5 7 6 8 9 10 11 15 14 13 12 18 17 16 Plate 6 II IDR IDO 3G FRONT PANEL...
Страница 152: ...1 7 2 3 4 5 IDR IDO 3G_MC9_IDR IDO_3 4 AR OUVERT_PRES_01_01 6 Plate 6 III IDR IDO 3G INTERNAL VIEW...
Страница 154: ...1 2 3 4 5 6 7 8 9 10 11 RIP IDO 3G_MC2_LED_ALIMENTATION_FAV_01_01 Plate 6 IV IDR IDO 3G PRIMARY MAINS OR DC CONVERTERS...
Страница 163: ......
Страница 164: ...MC2 RR APP 00033 02 02 EN...