
9
10
The following points should be considered when selecting an installation
location.
The wall bearing inverters shall be able to hold the weight of at least 4
times of the weight of the inverters.
The location shall be convenient for electrical connection, operation and
maintenance.
The ingress protection of the inverter is IP66, so it can be installed both
indoors and outdoors.
The temperature of the cooling fin may exceed 75
℃,
so select safe
locations.
The location must be well ventilated and sheltered from direct sunlight,
rain or snow.
Ensure the visibility of the LED lights and LCD display on the front panel
of inverters.
Install inverters vertically or with a backward tilt within 15 degrees. No
lateral tilt is allowed.
If more than one inverter are installed in one location, a minimum 150
mm clearance should be kept between two inverters and a minimum 300
mm clearance between inverters and the ground.
The Inverter is to be installed in a high traffic area where the fault is likely
to be seen.
4.2 Inverter Mounting
Dimension of the mounting bracket:
Unit: mm
Procedures:
1) Ensure that the bracket is horizontal. Mark the position of the drill holes.
For brick walls, the position of the holes should suit expansion screws.
2) Use a 10 mm drill bit to drill mounting holes of 40 mm deep.
3) Insert the expansion tubes into holes.
4) Screw the expansion screws into expansion tubes with a cross
screwdriver to fix the bracket on the wall.
5) Lift up the inverter, and hang it on the mounting bracket securely.
6) Lock the inverter to the mounting bracket with screws.
NOTE:
To protect your hands from scratch, please wear gloves!
Содержание EES6KPro-M1
Страница 26: ...49 50...