13) Testing unit operation
The PT call points need to have the protective flip lid opened
first and then the main plunger pressed in.
Fig 7 -PT Push Action
The plunger will remain in the down/latched position until
the unit is reset. This is done by lifting the plunger back
up using the tool reset key provided.
14) Maintenance, Overhaul & Repair
Maintenance, repair and overhaul of the equipment should
only be carried out by suitably qualified personnel in
accordance with the current relevant standards:
To avoid a possible electrostatic charge the unit must only be
cleaned with a damp cloth.
Units must not be opened while an explosive atmosphere is
present.
EN60079-19
IEC60079-19
Explosive atmospheres - Equipment repair,
overhaul and reclamation
EN 60079-17
IEC60079-17
Explosive atmospheres - Electrical
installations inspection and maintenance