8)  Power Supply Selection 

 

It is important that a suitable power supply is used to run the 
equipment. The power supply selected must have the 
necessary capacity to provide the input current to all of the 
units. 

 

The following table shows the input current taken by the 
various hootronic sounders and shows the maximum voltage 
at which the hootronic sounders can be operated: 

 

9)  Selection of Cable. Cable Glands, Blanking 

Elements & Adapters

 

 

When selecting the cable size, consideration must be given 
to the input current that each unit draws (see table above), 
the number of hootronic sounders on the line and the length 
of the cable runs. The cable size selected must have the 
necessary capacity to provide the input current to all of the 
hootronic sounders connected to the line.  

 

For ambient temperatures over +40ºC the cable entry 
temperature may 70ºC and therefore suitable heat 
resisting cables and cable glands must be used, with a rated 
service temperature of at least 110ºC 

 

The dual cable gland entries have an M20 x 1.5 entry thread. 
To maintain the ingress protection rating and mode of 
protection, the cable entries must be fitted with suitably rated 
ATEX / IECEx certified cable glands and/or suitably rated 
ATEX / IECEx certified blanking devices during installation 
according to EN / IEC60079-14. 

 

If a high IP (Ingress Protection) rating is required then a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs.  

 

For use in explosive dust atmospheres, a minimum ingress 
protection rating of IP6X must be maintained. 

 

The BEx hootronic sounder range can be supplied with the 
following types of adapters: 

 

M20 to ½” NPT 
M20 to ¾” NPT 
M20 to M25 

 

It is important to note that stopping plugs cannot be fitted 
onto adapters, only directly onto the M20 entries. 

 

Any other adapters used must be suitably rated and ATEX / 
IECEx certified adapters. 

 
 
 
 
 
 
 
 
 
 
 

10) Earthing 

 

Both AC and DC hootronic sounder units must be connected 
to an earth. The units are provided with internal and external 
earth terminals which are both located on the terminal 
chamber section of the unit. 

 

Fig. 3 Internal View of Cover 

 

When using the internal earth terminal ensure that the 
stainless steel M4 flat washer is between the incoming earth 
wire and the enclosure.  

 

Internal earthing connections should be made to the Internal 
Earth terminal in the base of the housing using a ring crimp 
terminal to secure the earth conductor under the earth clamp. 
The earth conductor should be at least equal in size and 
rating to the incoming power conductors. 

 

External earthing connections should be made to the M5 
earth stud, using a ring crimp terminal to secure the earth 
conductor to the earth stud. The external earth conductor 
should be at least 4mm² in size. 

 

11) Cable Connections 

 

Electrical connections are to be made into the terminal blocks 
on the PCBA located in the flameproof enclosure. See 
section 7 of this manual for access to the flameproof 
enclosure.  

 

Wires having a cross sectional area between 0.5 mm² to 
2.5mm² can be connected to each terminal way. If an input 
and output wire is required the 2-off Live/Neutral or +/- 
terminals can be used. If fitting 2-off wires to one terminal 
way the sum of the 2-off wires must be a maximum cross 
sectional area of 2.5mm². Strip wires to 8mm. Wires may also 
be fitted using ferrules. Terminal screws need to be tightened 
down with a tightening torque of 0.45 Nm / 5 Lb-in. When 
connecting wires to the terminals great care should be taken 
to dress the wires so that when the cover is inserted into the 
chamber the wires do not exert excess pressure on the 
terminal blocks. This is particularly important when using 
cables with large cross sectional areas such as 2.5mm². 

 
 
 
 
 
 
 
 
 

Model No. 

Nominal I/P 

Voltage 

Input 

Current 

Max. I/P 

Volts 

BExH120DDC024 24Vdc 400mA 30V 

BExH120DAC115 115Vac 130mA 

 

126.5V 

 

BExH120DAC230 230Vac 65mA 253V 

External Earthing 

Internal 
Earthing 

Internal 
Bonding 
Wire 
Terminal 

2-off M20 
Cable 
Entries

Содержание BExH120D

Страница 1: ...ate No KEMA 99ATEX6312X IECEx KEM 10 0003X The units can be installed in locations with the following conditions Area Classification Gas Zone 1 Explosive gas air mixture likely to occur in normal oper...

Страница 2: ...The location of the hootronic sounder should be made with due regard to the area over which the warning signal must be visible They should only be fixed to services that can carry the weight of the un...

Страница 3: ...topping plugs cannot be fitted onto adapters only directly onto the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC hootronic so...

Страница 4: ...nd N supply terminals see fig 4 12 2 2 AC Units Second and Third Stage Tone Selection To select the second and third stage tones on the BExH120 AC hootronic sounder Stage two S2 Operation Power L and...

Страница 5: ...Header Pins alters stage 2 tone Stage three S3 Operation Power ve and ve link a ve supply line to the S3 terminal Header pins alters stage 3 tone 2 3 S top 1 2 3 S2 S3 Stop ve ve Fig 7 DC Terminals 1...

Страница 6: ...The sounders can then be switched to sound second and third stage alarm sounds The sounds are selected by pin headers on the pcb for both DC and AC units The sound table below shows the pin header pos...

Страница 7: ...y suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosiv...

Отзывы: