9
HOW TO T
AKE DOWN
TAKE DOWN INSTRUCTIONS
STEP 1
With partner, disengage quick release
pins. Depress snap button toggle on legs
and telescope inner legs into outer legs.
Repeat on other legs, making sure to do
two legs at a time.
STEP 2
Stand under shelter and locate center
hub. Disengage quick release pins.
While holding center peak pole, release
top frame inner peak beams by pushing
snap buttons one at a time on all top
frame inner peak beams to disengage.
WARNING:
After all peak beam
assembly snap buttons are released
GENTLY lower center hub. Center hub
should drop down in an inverted position
and rest near the ground.
STEP 3
Release Auto Slider
®
at each corner by
first lifting hem of top. With one hand,
push up on truss near slider, release
quick pin by pulling ring.
STEP 4
With one or two partners at opposite
sides of shelter make sure peak beam
assembly snap buttons are disengaged.
Lift shelter up slightly and shake while
stepping toward one another until shelter
is fully closed. Be careful not to pinch
fingers. Store shelter in cover bag.
Snap Button
Quick
Release
Pin