SHANGHAI ESURVEY GNSS CO., LTD.
22
3. To precisely level the instrument up, make the plate level parallel to the connecting
line of two foot screws, and turn the third foot screw.
4. To power on the instrument, press
for 3 seconds, and make sure the
compensator is turned on (Character
shows).
5. Aim the telescope at the reticle center on the face left, and write down the vertical
angle VI.
6. Adjust the third foot screw, make the instrument tilt 3' (6 lattices set in the reticle)
upwards, turn the vertical tangent screw, collimate the target again, and write down
the vertical angle VI1.
7. Adjust the third foot screw, make the instrument tilt 3' (12 lattices set in the reticle)
downwards, turn the vertical tangent screw, collimate the target again, and write down
the vertical angle VI2.
8. Calculate the value of |VI1-VI| and |VI2-VI|, and check if the results are less than 5':
o
If they are, no adjustment is required.
o
If not, proceed to step
9
.
9. To enter the factory setting, power off the instrument, press
,
V/%
and
R/L
at the
same time, release
, and release
V/%
and
R/L
at the same time when character
FAC
shows. The character
SETP1
flashes on the second line on the display.
10. Adjust the third foot screw to aim the target, write down the vertical angle VI1, and
press
OSET
. The character
SETP2
flashes on the second line on the display.
11. Adjust the vertical tangent screw, and make the vertical angle plus 3'.
12. Adjust the third foot screw to aim the target, write down the vertical angle VI2, and
press
0SET
. The character
SETP3
flashes on the second line on the display.
13. Adjust the vertical tangent screw, and make the vertical angle minus 6'.
14. Adjust the third foot screw to aim the target, write down the vertical angle VI3, and
press
0SET
.
15. Mare the maximum among VI1, VI2 and VI3 as VImax and the minimum as VImin.
16. Calculate the value of |VImax-VImin|, and check if the result is less than 6''.
o
If it is, adjustment finishes.
o
If not, repeat step
9
-
16
.
Содержание ET2A
Страница 1: ...ET2AElectronicDigitalTheodolite MAINTENANCE GUIDE Shanghai eSurvey GNSS Co Ltd...
Страница 2: ......
Страница 4: ...SHANGHAI ESURVEY GNSS CO LTD...
Страница 10: ...SHANGHAI ESURVEY GNSS CO LTD 4 2 ET2A at a Glance 2 1 Important Parts The important parts of ET2A is as follows...
Страница 13: ...SHANGHAI ESURVEY GNSS CO LTD 7 After disassembling the left cover the structure is as follows...
Страница 17: ...SHANGHAI ESURVEY GNSS CO LTD 11 After disassembling the right cover the structure is as follows...
Страница 36: ......
Страница 37: ......