1
1
IR INTELLIGENT SPEED DOME INSTALLATION
1.1
Installation Preparation
Basic Requirement
All installation and operation here should conform to your local electrical safety codes.
Before installation, please open the package and check all the components are included.
Please make sure the speed dome installation environment and installation mode can meet
your requirement. If there is special requirement, please contact your local retailer for more
information.
We assume no liability or responsibility for all the fires or electrical shock caused by
improper handling or installation.
Check installation space and installation location intension
Please make sure the installation environment has enough space to install the speed dome and
its corresponding bracket.
Please make sure the ceiling, wall and the bracket can support the speed dome and its
corresponding installation component. It shall sustain the 8X weight of the speed dome.
About cable
Please select the cable according to your transmission distance.
The minimum video coaxial-cable requirement is:
75 ohm.
Full cable with copper conductor
95% knitted copper shield
International Model
Max Transmission Distance
(Ft\M)
RG59/U
750Ft (229M)
RG6/U
1,000Ft (305M)
RG11/U
1,500Ft (457M)
Note:
The above can be applied to analog speed dome and network speed dome
International Model
Max Transmission Distance
(M\Ft)
SYV-75-3
720P(25fps\30fps)
:
500M/1640Ft
720P(50fps\60fps)
:
300M/984Ft
1080P(25fps\30fps): 300M/984Ft
Note:
The above can be applied to HDCVI speed dome.
Set dial switch button
Set dial switch button according to control protocol and speed dome address. (Please refer to
user
’s manual for detailed information.)
Please keep all package material well for future use
Содержание ELI-IP5-APTZ21S-30XR
Страница 3: ...iii 7 4 RS485 Bus FAQ 20 8 APPENDIX SAFETY ROPE INSTALLATION 21...
Страница 20: ...13 Figure 3 3...
Страница 22: ...15 Figure 4 3...