• Using the assembly template (Page 30 - 31) in the user manual of the device, the locations of
the fixing screws of the wall bracket and the mounting bracket are marked.
• After the marked points are drilled, the wall bracket and mounting bracket are securely fixed to
the wall with the dowel and fixing screws included in the packaging of the device.
• Finally, the bracket on the rear surface of the combi boiler is placed on the hooks on the
bracket that you mounted on the wall and then the combi boiler is hanged on the wall.
a) Central heating pipe 3/4" outlet line (hot)
b) Domestic water pipe 1/2" outlet line (hot)
c) Domestic water pipe 1/2" inlet line (cold)
d) Central heating pipe 3/4" return line (cold)
- A suitable sized valve should be
installed in the water pipelines. In
addition, a strainer must be
placed in the domestic water
(1/2") pipe inlet line and central
heating (3/4") pipe return line.
- The hose from the 3-bar safety
valve must be connected to the
sewage drain line.
2
- CONNECTIONS
2
.1- Water Pipe Connections
-
The water connections between the wall mounting bracket fixed on the wall and the combi
boiler are made with the pipe group and nipples as shown in the figure
.
2
.1.1- MT Model
EN
3
Содержание ARCEUS 6 kW MT
Страница 10: ...1 1 1 8 10 mm Min 50mm Min 250 mm 250 50 mm 5 35 C 100 cm 85 C 1 2 MK 10...
Страница 11: ...30 31 2 2 1 2 1 1 MT a 3 4 b 1 2 c 1 2 d 3 4 1 2 3 4 3 12 MK 11...
Страница 12: ...2 1 2 CH M 3 4 3 4 13 CH 2 1 3 ST Mo 3 4 1 2 1 2 1 2 3 4 14 ST MK 12...
Страница 13: ...3 MK 13...
Страница 34: ...1 1 1 8 10 mm 50 250 mm 250 50 mm combi 5 35 C 100 cm 85 C GR 34...
Страница 35: ...1 2 30 31 combi combi 2 2 1 2 1 1 12 3 4 1 2 1 2 3 4 1 2 3 4 3 bar 19 GR 35...
Страница 36: ...13 CH 2 1 2 CH 3 4 3 4 2 1 3 ST 3 4 1 2 1 2 1 2 3 4 14 ST GR 36...
Страница 37: ...3 Timer GR 37...