10 / 10
Montageanleitung / Installation Manual
General Maintenance Instructions
All maintenance has to be done acc. to EN11767 in the current version.
The maintenance has to be done by qualified personnel*.
The maintenance has to be documented, if necessary pictures have to be added to the protocol.
The maintenance periods are just a guideline.
They are depending on how often the playground is used.
At least all 14 days**(visual inspection) Check at least the following:
Cleanliness
Ground clearance
Ground surface conditions
Visible basements
Sharp edges
Missing parts
Excessive abrasion
All 1 – 3 months (operative inspection) Check at least the following:
All checks from visual inspection
Covered parts have to be disassembled and checked for corrosion
Once a year (Main inspection) Check at least the following:
All checks from operative inspection
Basements have to be exposed and checked.
*The garade of qualification depends on the type of work
**For high frequented playgrounds or vandalism endangered playgrounds a daily inspection can be necessary
Содержание 220990
Страница 12: ......