
Page 14
Refer
to
Pictorial
1
for
the
fol
‐
lowing
steps.
(
)
Load
and
solder
the
two
mono
minijacks,
J1
and
J2,
where
shown.
Be
sure
they
lie
flat
against
the
board.
Be
careful
not
to
damage
the
plastic
bodies
with
the
soldering
iron.
Note
that
two
of
the
tabs
extending
into
the
holes
in
the
board
are
plastic,
so
do
not
apply
solder
to
these.
(
)
Load
and
solder
RV1,
the
vol
‐
ume
control.
Be
sure
that
it
lies
flat
against
the
board.
(
)
Load
and
solder
the
BNC
con
‐
nector.
Be
sure
it
lies
flat
against
the
board.
(
)
Load
and
solder
the
2
‐
pin
right
‐
angle
connector
at
J4.
This
connector
mounts
to
the
bottom
of
the
board
and
ex
‐
tends
out
into
the
opening.
(
)
Load
and
solder
D3,
the
large
1N5404
rectifier.
Insert
the
side
with
a
band
(the
cath
‐
ode)
into
the
square
pad
with
the
part
oriented
vertically.
Bend
the
anode
lead
down
and
into
the
other
hole.
Solder
both
leads
and
clip
excess
lead
length.
(
)
Load
and
solder
RV2,
the
10K
trimpot.
Clip
excess
lead
length.
(
)
Load
and
solder
T1,
the
6
‐
pin
DIP
transformer.
The
pin
marked
with
a
dot
must
go
into
the
square
pad.
(
)
Load
and
solder
the
seven
crystals,
Y1
‐
Y7.
Be
sure
they
lie
flat
against
the
board.
It
does
not
matter
which
side
the
lettering
goes
on,
but
most
builders
prefer
to
line
them
up
so
that
the
text
reads
the
same
on
all
crys
‐
tals.
Clip
excess
lead
lengths
after
soldering.
(
)
Insert
3”
of
bare
wire
into
the
holes
just
below
the
“Y1”
and
“Y7”
text
to
the
right
of
the
crystals.
Place
it
so
that
you
can
solder
it
to
the
top
of
all
the
crystals.
Sol
‐
der
the
two
ends,
then
solder
it
to
the
top
of
each
crys
‐
tal.
Do
not
use
any
more
heat
than
necessary.
(
)
Load
and
solder
the
330
uF
electrolytic
capacitor
(C12).
Be
sure
the
black
stripe
is
on
the
side
with
the
round
pad.
The
longer
lead
is
the
positive
lead,
and
it
goes
in
the
hole
with
the
square
pad
(also
marked
with
a
“+”
on
the
silkscreen).
(
)
Load
and
solder
the
470uF
ca
‐
STEP-BY-STEP ASSEMBLY - HT-7-2 Board
Содержание HT-7
Страница 1: ...Page DZKit ASSEMBLY MANUAL HT 7 40M AM HANDIE TALKIE Price 10 00 DZ CompanY LOVELAND COLORADO...
Страница 15: ...Page 15 Pictorial 1 Component placement on HT 7 2 Board...
Страница 26: ...Page 26...
Страница 35: ...Page 35 SCHEMATICS...
Страница 36: ...Page 36...
Страница 37: ...Page 37...
Страница 38: ...Page 38...
Страница 40: ...Page 40 COMPONENT LOCATOR...
Страница 41: ...Page 41 NOTES Use this page to keep track of modifications purchase information service or anything you like...
Страница 42: ...Page 42...
Страница 43: ...Page 43...
Страница 44: ...Page 44 DZ COMPANY UNIQUE electronic equipment in kit form LOVELAND COLORADO...