C H A P T E R 2
Cable Routing
Above Ground Model 250i Motorcycle Dynamometer Installation Guide
2-30
I
NSTALLING
THE
D
YNO
W
ARE
RT M
AIN
M
ODULE
Slide the DynoWare RT main module into the bracket assembly in the dyno.
Figure 2-25: Install the DynoWare RT Main Module
R
OUTING
THE
C
ABLES
Use the following instructions along with Figure 2-27 on page 2-32 for routing and
connecting the cables.
1
Remove the two screws securing the cable pass through cover closest to the
monitor support and set it aside.
2
Route the CAN pendant cable (B) through the cable pass through closest to the
monitor support and attach to the front of the DynoWare RT module.
3
Route the network cable (P) to the back of the DynoWare RT module.
4
Route the 15-pin control panel (O) cable from the intercept board through the
cable pass through closest to the monitor support and attach to the control panel.
Refer to “Connecting the Control Panel Cable” on page 2-33.
5
Place a split snap bushing around the pendant cable and secure the cable through
one hole in the cable pass through cover.
6
Place a split snap bushing around the control panel cable and secure it in the other
hole on the cable pass through cover. The bushing should be around the cable
protective wrap.
7
Secure the cable pass through cover to the dyno using the two screws removed
earlier.
8
Attach the speed pickup/brake cable (F) to the back of the DynoWare RT module.
Note:
The white two-pin connector on the speed pickup/brake cable is only used
if an air brake is installed.
9
Attach the temp sensor cable (H) to the eddy current brake driver.
10 Attach the load cell cable (I), if present, to the eddy current brake driver.
MC154