P/N: 974153 |
Rev: 072016
|
ECO: 46503
www.dynisco.com
From lab to production,
providing a window into the process
-34-
HART Communicator Fast Key sequences
Function
Fast Key Sequence
Read PV Pressure
2
Read % of Full Scale
1,1,2
Read Analog Output (PV)
1,1,3
Read SV Electronics Temperature
1,1,7
Read Peak Pressure Value
1,2,1,2
Read Peak Electronic Temp Value (SV)
1,2,1,3
Read Sensor Diagnostic Status
1,2,1,1
Read PV Minimum Span
1,4,1,5
Perform Sensor Self-Test
1,2,2
Perform Sensor Master Reset
1,2,3
Perform Loop Test
1,2,4
Perform D/A Trim (PV)
1,2,5,1,2
Perform Zero Trim
1,2,1,3,1
Perform Lower Sensor Trim
1,2,5,1,3,2
Perform Upper Sensor Trim
1,2,5,1,3,3
Recall Factory Trim
1,2,5,3
Set Rcal %
1,2,5,1,4,1
Set Tag
1,3,1
Set PV Unit
1,3,2
Set Lower Range Value (LRV) (PV)
1,3,3,1
Set Upper Range Value (URV) (PV)
1,3,3,2
Display Lower Set Limit (LSL) (PV)
1,3,3,5
Display Upper Set Limit (USL) (PV)
1,3,3,6
Set Date
1,3,4,1
Set Descriptor
1,3,4,2
Set Message
1,3,4,3
Set PV Damping
1,3,5
Set SV Temperature Unit
1,4,1,7
Set PV Analog Output Alarm Type
1,4,2,2,3
Set Poll Address
1,4,2,3,1
Set # of Request Preambles
1,4,2,3,2
Set Burst Mode
1,4,2,3,3
Set Burst Option
1,4,2,3,4
Read Analog Output (TV)
1,1,6
Read Peak Temp Value (TV)
1,2,3,4
Perform D/A Trim (TV)
1,2,5,2,2
Set Lower Range Value (LRV) (TV)
1,3,3,3
Set Upper Range Value (URV) (TV)
1,3,3,4
Temperature Override
1,2,5,2,1,1
Temperature Override Value
1,2,5,2,1,2
Содержание SPX228
Страница 39: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 39...
Страница 41: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 41...
Страница 42: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 42...
Страница 43: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 43...
Страница 45: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 45...
Страница 46: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 46...
Страница 47: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 47...
Страница 48: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 48...
Страница 50: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 50...
Страница 53: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 53...
Страница 54: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 54...
Страница 55: ...P N 974153 Rev 072016 ECO 46503 www dynisco com From lab to production providing a window into the process 55...