6.1 Mounting the Pressure Transmitter
6.2 Electrical Connection
Mounting and electrical connection of the PT must be done by specialists
with EMC training, following all applicable regulations, and in
pressureless, voltage-free, intrinsically safe
condition with the
machine
switched off.
The machine must be secured against being switched back on!
ESD sensitive component. Electrostatic discharge may damage the PT.
Take ESD
precautions.
Before mounting the PT, check the process connection carefully.
Before mounting the PT, ensure that the process connection is free from
media.
To prevent the PT from sticking permanently in the process connection,
coat the thread
section of the transmitter with high temperature resistant grease or a
suitable parting
agent.
Always use a torque wrench when screwing the PT in and out. Do not
apply the tool to
the housing or housing / electrical connection!
• Screw the PT into the process connection and tighten.
Mounting and electrical connection of the PT must be done by specialists
with EMC training, following all applicable regulations, and in
pressureless, voltage-free,
condition with the
machine switched off.
The machine must be secured against being switched back on!