From lab to production,
providing a window into the process
-40-
If you don't use gloves, you will eventually get burned. If you are using PVC die
(D3364 for unstable materials), be sure to get the material out of the conical
top section.
Standard dies have a flat entrance and exit. When the die is out of the
barrel it cools down quickly. The longer it is out, the longer the wait for the
temperature to stabilize will be.
Minimizing the time the die stays out of the machine will increase the number of tests you can
run per time. When the temperature on the front display is within 0.2 C of the set point, you can
begin the next test. Loading material will cause a small temperature change even if the
temperature set point is locked in. A sufficient melt time, (360 seconds, for example) will allow
ample time to get the temperature to the set point and stabilize before the first data point is
collected.
Always leave the machine clean. If it is going to sit at room temperature for an extended
period of time, you may wish to coat the barrel with a light machine oil to prevent rusting. The
oil will need to be cleaned with cleaning patches from the machine before accurate data can
be obtained.
Warning
:
Do not heat the barrel back to elevated temperatures before
cleaning the machine oil from the barrel. Noxious fumes and/or fire
hazard exists if not cleaned.
TROUBLESHOOTING
Actions
Getting incorrect or non-repeatable test values:
Was the instrument clean?
Check density value
Check tip diameter (> 0.3727)
Check Die (clean, diameter length OK?)
Check Machine is Level
Check Temperature
Check weights used +/- 0.5%
Check balance used to weigh extrudate
Piston Rod Bent?
Check die can get to bottom of barrel?
Generic Run Check List
Prior to loading Sample:
Is material properly prepared (dried, mixed, checked for contaminates)?
Machine on for 20 minutes to allow temperature to stabilize?
Correct Die in machine?
Correct program being run?
Hand tools in position for run (packing funnel and tool, cleaning drill bit etc.)?
Encoder Arm in place?
P/N: M0726(3)
| Rev: 012020 | ECO: 51182
www.dynisco.com
Содержание LMI5000
Страница 30: ...From lab to production providing a window into the process 31 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 31: ...From lab to production providing a window into the process 32 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 32: ...From lab to production providing a window into the process 33 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 33: ...From lab to production providing a window into the process 34 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 34: ...From lab to production providing a window into the process 35 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 35: ...From lab to production providing a window into the process 36 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 37: ...From lab to production providing a window into the process 38 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 42: ...From lab to production providing a window into the process 43 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 43: ...From lab to production providing a window into the process 44 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 50: ...From lab to production providing a window into the process 51 P N M0726 3 Rev 012020 ECO 51182 www dynisco com ...
Страница 53: ...From lab to production providing a window into the process 54 P N M0726 Rev 012020 ECO 51182 www dynisco com ...