POWERCUBE User Manual
16
Table 3-2 Installation steps
Step1
Installation
preparation
Confirm that the ON/OFF switch on the front panel of each
B3 unit is in the “OFF” state to ensure no live operation.
Step 2
Mechanical
installation
1. Cabinet placement position determination
2. Top cables pre-installed
3. Battery module installation
Step3
Electrical
installation
1. Battery module parallel cable installation
2. Battery module Power cable- positive installation
3. Battery module Power cable- negative installation
4. Communication parallel cable connection
Step4
Battery system
self-test
1. Press the ON/OFF switch to the "ON" state
2. BMS system power-on activation
3. Check the system output voltage
4. Shut down the system
Step5
Connect to the
inverter
1. Wiring the battery system Power cable- positive and
Power cable- positive to the circuit breaker between the
inverter and battery system.
2. Connect the Communication cable to inverter
3.2.1 Installation preparation
1. Prepare equipment and tools for installation
2. Check the cabinet and confirm that the ON/OFF switch on the front panel of each
battery module is in the "OFF" state to ensure no live operation.
3.2.2 Mechanical installation
Figure3-1
1. Fix the Powercube cabinet to the mounting
position and remove the front cover.
Please refer to 3.2 to place the cabinet on
the ground.
Pass the total positive cable and the total
negative cable (
Power cable- positive1, Power
cable- positive2 and Power cable-negative1,
Power cable-negative2
) through the
waterproof connector (Interface1,2,5,6)on
the back of the cabinet, and insert the
external CAN cable(
Communication cable-to
inverter2
) into the RJ45 network cable
connector(Interface 4).