14
Step1
System outage
Ensure that the battery is in a shutdown state
Step 2
Mechanical
installation
1. Hanger mounting
2.Equipment installation
Step3
Electrical
installation
1. Connect the ground cable
2 Electrical installation
3.connect inverter
4.Communication interface connection
3.2.1 Floor installation
When the battery system is placed directly on the ground, a fixed support must be used
to fix the top of the battery box with the wall.
3
.
4 holes with diameter of 10mm shall
be opened on the wall with electric
drill according to the marked position,
and the hole depth shall be greater
than 70mm to fit the expansion bolts
of M6.
1
.
Draw the hole opening position of
the screw on the wall with the
positioning board supplied with
the goods, such as the four holes
in the left picture.
2
.
The bottom of board must be good
connection with the ground level
while drawing the holes.
Содержание Powebox F Series
Страница 1: ...POWERBOX F User Manual ...