Step 10: Battery and inverter are connected! 

Now inverter is started, it should show the battery voltage ,battery 
and inverter are connected! 

   

 

 
Step 11: Inverter setup

 

 

Long press ENTER to set, make sure 05 are properly set as 
below: 

05 

LI type(Lithium) 

                 

 

                     

 

 

Содержание DYN-B4850

Страница 1: ...tch Follow Dyness user manual to check details it is recommended to use battery in 1 2 configuration In our case now 5kW inverter connects to 9 6kWh battery Step 1 Cable connect in inverter Keep both inverter and battery completely off Connect power cable and comm cable to inverter first Note Comm cable has label on make sure the inverter side goes to battery side inverter side to the inverter BMS...

Страница 2: ...er cable parallel cable communication cable Bat Inv and comm cable Bat Bat as above 1 Comm cable from the host CAN IN port to the inverter CAN port 2 Comm cable from the host CAN OUT to slave1 CAN IN slave1 CAN OUT to slave2 CAN IN 3 Power cable should be connected diagonally one is connected at the top socket and another one is at the bottom ...

Страница 3: ...er or Fuse between inverter and battery to protect both products Step 5 Switch on all the B4850 power switch then press the host SW button about 3S to wake up it all the slaves will be woken up automatically Step 6 Turn on the DC breaker Step 7 Power on the inverter ...

Страница 4: ...inverter are connected Now inverter is started it should show the battery voltage battery and inverter are connected Step 11 Inverter setup Long press ENTER to set make sure 05 are properly set as below 05 LI type Lithium ...

Страница 5: ...go Step 13 Shut Down 1 Remove all the load 2 Disconnect PV Grid 3 Turn off DC breaker between the battery and inverter 4 Turn off the inverter power switch shut down the inverter 5 Long press SW button to power off the battery then switch off all the batteries Power switch ...

Отзывы: