25
Dynaset Oy | Menotie 3, 33470 Ylöjärvi | puh. 03 3488 200 | [email protected] | www.dynaset.com
HYDRAULIC VIBRAS
INSTALLATION
4.3. INSTALLATION OF HVD
The HVD unit can be installed into the base machine’s existing tool line or create a
hydraulic line for it using Dynaset PV-SAE.
GENERAL INSTALLATION
1. A) HVD is installed parallel and as close as possible to the working cylinder. B)
Install the HVD as center of the tool as possible.
Picture 14: Installation position
2. Use the installation plate to install the HVD as shown in the picture below. Screw
first the Installation plate to the HVD (A). Recommended allen screws for HVD55
are 4 pcs 8.8 M10x80, tightening toque 45 Nm. Recommended allen screws for
HVD90 are 4 pcs 12.9 M14x90, tightening toque135 Nm.
3. Install the HVD to the tools surface. Recommended screws for HVD55 are 8.8
M10, tightening torque 45 Nm. Recommended screws for HVD90 are 12.9 M16,
tightening torque 300 Nm.
Picture 15: Installing HVD and installation plate
4. Connect the (P) pressure line and the (T) return line to the HVDs corresponding
places.
Содержание HVB 350/18-60
Страница 2: ......
Страница 53: ... DYNASET OY all rights reserved ...