background image

 

INSTRUCTION MANUAL – BV21 

 

File: 4700369407_ENG_NO.doc 

Page 7 / 15 

 

-

 

Level in the usual way, pour on the concrete and place your beam at the start of the first strip. 

-

 

Fit the handle and adjust it to shoulder height using lever 6

-

 

Before  starting,  spray  diesel  or  shuttering  oil  on  the  beam  to  prevent  it  from  sticking  to  the 

concrete. 

-

 

Start the engine (see below instructions). 

-

 

Adjust the vibration to suit the fluidity of the concrete. 

-

 

Position the handle over your shoulder so that the edge of the beam nearer you is slightly raised. 

-

 

Pull slowly towards you and repeat, if necessary. 

-

 

When  smoothing  the  following  strip,  position  the  rule  so  that  it  overlaps  the  area  already 

smoothed by 15cm. 

STARTING

 

 

 

Fill the engine tank with unleaded 95 octane gasoline . 

 

Check that the throttle control is settled at idle position . 

 

Check that stop button situated on the throttle lever is in the ON position . 

 

If engine is cold closed choke lever . 

 

Press the primary pump several time in order to ensure that return hose gasoline is fill . 

 

Start the engine with a firm pull on the starter cord . Do not use excessive force and never pull 

the cord out to its full length . 

 

Let the engine warm up for a few minutes , open the choke if it has been closed . 

 

Increase the engine speed tanks to the throttle lever situated on the RH operating handle . Then 

the vibration will start . 

STOPPING 

 

- Set the throttle lever at idle position then the vibration will stop . 

- Press the stop button situated on the RH operating handle until the engine has come to a complete 

stop. 

MAINTENANCE

 

 

Never use a high pressure cleaner to clean the beam. 

 

Clean away the concrete which has been collected after each use. 
Check the electrical equipment to see that it is undamaged and working well. 
Repair any fault immediately. Check bolts and nuts tightening. 
For the gasoline engine ,refer to the operator handbook for servicing. 
 
Maintenance kit :  

P/N 4700369936 (including Throttle cable , Shock absorber , 
bearings , motor spark plug and air filter ). 

ORDER NUMBERS 

 

BV21C (2 meters Honda Engine) P/N 4700369393 . 

Profile 1.5 m P/N 4700369385 

Profile 2.0 m P/N 4700369384 

Profile 2.5 m P/N 4700369386 

Profile 3.0 m P/N 4700369387 

Содержание BV21

Страница 1: ...CONCRETE EQUIPMENT CONCRETE EQUIPMENT CONCRETE EQUIPMENT CONCRETE EQUIPMENT Manual number 4700369407_ENG_NO DOC Revision 1 BV21 Finishing vibrating beam Instructions and spare parts catalogue...

Страница 2: ...INSTRUCTION MANUAL BV21 File 4700369407_ENG_NO doc Page 2 15...

Страница 3: ...Symbols 4 Important rules for your safety 4 Safety equipment 4 Working area 4 Power supply 5 Starting the machine 5 Operation 5 Maintenance 5 Be alert 5 GENERAL 6 DESIGN 6 TECHNICAL DATA 6 OPERATING I...

Страница 4: ...s and keep them in a safe place Make sure that the signs about using safety and maintenance are always legible The use of the machine is restricted to the applications specified in the product literat...

Страница 5: ...conds Machine powered by petrol or diesel engine Petrol has an extremely low flash point and can be explosive in certain situations Keep away from all hot or spark generating objects do not smoke when...

Страница 6: ...orners The BV vibrating beams are available with a four stroke engine HONDA GX25 which produce an efficient surface compaction effect TECHNICAL DATA BV 21C P N 4700369393 Working width m ft 2 6 5 Fini...

Страница 7: ...e that return hose gasoline is fill Start the engine with a firm pull on the starter cord Do not use excessive force and never pull the cord out to its full length Let the engine warm up for a few min...

Страница 8: ...INSTRUCTION MANUAL BV21 File 4700369407_ENG_NO doc Page 8 15...

Страница 9: ...INI DI RICAMBI Per evitare errori nelle consegne di ricambi Vi preghiamo di comunicarci le seguenti informazioni al momento dell ordinazione 1 Tipo di macchina 2 Numero di serie della macchina 3 Quant...

Страница 10: ...rofile 2m 4700369384 1 13 Holder 4700369394 1 14 Tube 4700369395 1 15 Holder 4700369396 1 16 Connecting rod 4700369397 1 17 Shaft 4700369398 1 18 Eccentric 4700369399 1 19 Frame 4700369400 1 20 Coupli...

Страница 11: ...INSTRUCTION MANUAL BV21 File 4700369407_ENG_NO doc Page 11 15...

Страница 12: ...Screw 4700533024 1 41 Nut 4700570004 3 42 Nut 4700570005 3 43 Nut 4700582006 3 44 Nut 4700586002 7 45 Nut 4700586003 1 46 Nut 4700586018 1 48 Waher 4700603009 2 49 Cable 4700900061 0 8m 51 Trottle cab...

Страница 13: ...PEISKA DIREKTIVET 98 37 EC AVRUPA D REKT F 98 37 EC ye uygun imal edildi ini conforme alle disposizioni della Direttiva 98 37 CE Direttiva Macchine Fabricado em conformidade com as DIRECTIVAS EUROPEIA...

Страница 14: ...ktriska Taip pat atitinka Europos standartus EN60745 1 tik elektriniams prietaisams Ook voldoet aan de Europese norm EN60745 1 indien het een elektrisch type is Jest tak e zgodne z EUROPEJSK NORM EN60...

Страница 15: ...ax 33 1 64 42 00 04 Factory address P O Box 63 Route de Neville 76460 Saint Valery en caux France Tel 33 2 35 57 07 76 Fax 33 2 35 97 48 82 We reserve the right to change specifications without notice...

Отзывы: