Installation, Operation and Service Manual
LKP Series
© 2016 DynAmp, LLC
Page 21
041738 I
TABLE 5.2
FORM FOR RECORDING CHANNEL VOLTAGE MEASUREMENTS
The following table is for the customer's convenience in keeping accurate records on his
unit's performance.
If the channel voltages are measured and recorded at least two hours after the system is
energized has been properly "centered" electrically, the information may prove valuable in
the event of any future malfunction.
It is a good idea to take an additional set of readings at the hottest time of the year,
especially if the equipment is exposed to outdoor temperatures; space is provided for the
recording of three sets of readings. NOTE: Although the channel voltages may vary
widely with temperature extremes, the accuracy will remain unaffected so long as each
channel voltage falls within the limits of +3V to +40Vdc*.
Channel voltages are measured between terminals at the Metering Unit terminal block with
the LKP meter unit in service on an energized bus.
INSTRUCTIONS
1. Record the channel measurements for every channel (make additional copies of this form as
needed).
2. Supply the information called for below.
CHANNEL VOLTAGES READINGS
FROM
TERMINAL
TO COMMON
TERMINAL
CHANNEL
NUMBER
DATE
____/____/___
_
DATE
____/____/___
_
DATE
____/____/___
_
TS1-
VOLTS
VOLTS
VOLTS
3
TS1-13 OR
TS1-52
1
4
“
2
5
“
3
6
“
4
7
“
5
8
“
6
41
“
7
42
“
8
43
“
9
44
“
10
[ ] LOOP BURDEN (TS2 - 5 & 6):
[ ] LINE VOLTAGE (TS 3-2 & -3):
[ ] BUS CURRENT (kA):
Serial Number: ________________________
* Read notes in “Magnetic Centering” section of the manual carefully.