
Page
7
Step
【
1
】
Installing the Ceiling Plate
Drilling into electrical wires can cause death or serious personal injury! Always make
certain area behind mounting area is free of electrical wires before drilling or installing.
Improper installation can lead to projector mount falling causing severe personal injury or
damage to equipment. It is installer’s responsibility to make sure the combined weight of all
components does not exceed weight capacity of 44lbs (20Kg).
Do not install near air conditioner vents where there is excessive dust or smoke.
Note:
To determine require mounting location; ensure that knowing the projector lens
distance to screen distance. Please see projector details specifications on
determining the distance
Masonry Installation
1. Disassemble the Ceiling Plate Cover from Ceiling Plate
(2)
as shown. (
See Figure 1-4
)
2. Attach the Ceiling Plate to masonry ceiling, mark the mounting location. Drill the masonry
pilot hole of 3/8”(10mm), pilot drill depth of 3”(75mm) and ensure the pilot hole are straight
and completely through the structural. Insert anchor into anchor hole and seat with gentle
tapping from hammer. Anchor should be fully engaged into structural. Repeat for
remaining anchor.
3. Insert Lag Bolt through Washer, Ceiling Plate (2) and install into pilot hole. Repeat for
remaining Lag Bolts. Select hardware that fits your application (See Figure 1-5).
Tighten the Lag Bolt so the Ceiling Plate is secured to the masonry ceiling. Do not
over tighten the Lag Bolt.
Figure 1-4