
Page
5
Step
【
1
】
Installing the Ceiling Plate
Drilling into electrical wires can cause death or serious personal injury! Always make
certain area behind mounting area is free of electrical wires before drilling or installing.
Improper installation can lead to projector mount falling causing severe personal injury or
damage to equipment. It is installer’s responsibility to make sure the combined weight of all
components does not exceed weight capacity of 44lbs (20Kg).
Do not install near air conditioner vents where there is excessive dust or smoke.
Note:
To determine require mounting location; ensure that knowing the projector lens
distance to screen distance. Please see projector details specifications on
determining the distance.
Wood Ceiling Installation
1. Disassemble the Ceiling Plate Cover from Ceiling Plate
(2)
as shown. (
See Figure 1-1
)
2. Place the Ceiling Plate to wood ceiling at desired location, mark location with pencil.
3. Drill wood ceiling pilot hole of 7/32” (5mm), pilot drill depth of 3”(75mm) and ensure pilot
hole are straight.
4. Insert Lag Bolt through Washer, Ceiling Plate and install into pilot hole. Repeat for
remaining Lag Bolts. Select hardware that fits your application (
See Figure 1-2
).
Tighten the Lag Bolt so the Ceiling Plate is secured to the wood ceiling. Do not over
tighten the Lag Bolt.
Plaster Ceiling Pilot
Pilot Hole Size
Pilot Drill Depth
7/32"
3 "
5mm
75mm
Figure 1-1