GENERAL INSTALLATION INFORMATION
Carefully uncrate and inspect your new bath for any shipping damage. If such damage is found, report it to your vendor
immediately. After inspection and during installation, protect the bath from construction damage. Before installing, the bath
must be filled with water to check for leaks that may have resulted from shipping damage or mishandling! Fittings (bath
filler, shower arm, etc.) are not provided with the bath and must be ordered separately. Framing and enclosing materials
are provided by others. Follow test procedures carefully.
ATTENTION INSTALLER!
TUBS ARE INTENDED FOR INDOOR USE ONLY.
If you have installation or warranty questions please do not return the unit to the place of purchase. Call 800-227-2734.
Always protect tub from construction damage by using a protective cover. Damage, including chips and scratches incurred
at the jobsite is excluded from warranty but may be repaired by qualified technician at the owner’s expense. Do not stand
in the tub or store materials in the tub during construction. Do not store tub in temperatures below 32 degrees Fahrenheit.
Protect all finished surfaces of the bathtub during construction and installation using a drop cloth.
RECOMMENDED TOOLS AND MATERIALS
Most of the procedures require the use of common tools and materials, which are available from hardware and plumbing
supply stores. It is essential that the tools and materials be on hand before work is begun.
TOOLS
SUPPLIES
REQUIRED COMPONENTS
• Level
• Tape Measure
• Pipe Wrench
• Slip Joint Pliers
• Screw Driver
• Standard Woodworking Tools
• Personal Safety Equipment
• Caulking Gun
• Drop Cloth
• Tub Adhesive
• Silicone Sealant
• Overflow and Drain Trim Kit -D11000000.XXX
must be ordered separately
• Bath Filler (not Included)