- 2 -
2
3
MAKE WATER SUPPLY CONNECTIONS
TEST INSTALLED FAUCET
• Turn off hot and cold water supplies before beginning.
• Connect FLEXIBLE SUPPLIES
(1, 2)
directly to wall supplies.
Connection on fitting supplies are 3/8" (10 mm) compression.
Connect left supply (Marked with a Red Stripe) to Hot and right
supply (Marked with Blue Stripe) to Cold wall supply. Use
adjustable wrench to tighten connections. Do not over tighten.
• Faucet supplies are 27-1/2" (699 mm) long from faucet base.
Note: If additional supply length is required, installer must
purchase additional parts separately.
Impor tant: If SUPPLY HOSES (1, 2) are too long, loop as
illustrated to avoid kinking.
M965558 Rev. 1.4 (4/17)
1
INSTALL FITTING
CAUTION
Turn off hot and cold wate
supplies before beginning.
• Make certain the O-RING SEAL
(1)
is properly seated in recess of faucet body.
• Insert supply HOSES
(2)
and SHANK
(3)
through center hole of sink or
mounting surface.
• Assemble RUBBER WASHER
(4)
, PLASTIC WASHER
(5)
, METAL WASHER
(6)
and
threaded LOCKNUT
(7)
onto SHANK
(3)
from underside of sink or mounting surface.
Hand tighten LOCKNUT
(7)
and check that faucet is centered.
• Use a screwdriver to tighten SCREWS
(8)
on LOCKNUT
(7)
. Work your way around
LOCKNUT
(7)
, tightening the screws slightly each time until all are snug to ensure
even pressure.
1
2
5
RECESS
4
3
6
7
8
RED
STRIPE
BLUE
STRIPE
1
2
COLD
HOT
• Move HANDLE
(1)
into “off” position.
• Unthread SPRAY END
(2)
from HOSE END
(3)
.
• Turn on water supplies and check connections
for leaks.
• Operate HANDLE
(1)
on and off, hot and cold to flush
water lines thoroughly. Replace SPRAY END
(2)
.
• Check all drain connections for leaks.
• Move HANDLE
(1)
into “off” position.
1
2
3
HOT & COLD SUPPLIES