Wood Pole Solar System Installation
•
Mount the solar panel to the
solar mount using the pre-drilled
mounting holes with the 4 ea.
5/16” x 3/4” bolts, washers and
lock nuts
.
(Fig. 1)
•
Drill 2 ea.
⅝
” holes, 9” c-c
spacing through the wood pole
near the top. The orientation for
these holes will be North/South
when the pole is erected.
(Fig. 2)
•
Mount assembled solar panel
frame to the wood pole with the
supplied
⅝
” x 18” Stainless steel
ready rod, flat
washers and nylon
lock nuts. Ensure that the solar
panel will be facing south when
the pole is erected.
(Fig. 2)
Fig. 1
Fig.2
Fig.3
•
Drill 2ea.
⅝
” holes, 9” c-c spacing through the wood pole
below the solar panel mount. The hole location will be
dependent on site requirements. The orientation for these
holes is determined by the direction the pole arm is to be
mounted. (Fig. 2)
•
Mount the battery box and pole arm to the wood pole with the
supplied
⅝
” x 18” Stainless steel ready rod, flat washers and
nylon lock nuts. The battery box can be mounted on the
opposite side of the pole or same side as the pole arm
depending on site conditions. (Fig. 3)
•
*order of operation may be altered depending on whether the system is assembled on
the ground and erected complete or assembled in place with the pole already standing