CHOOSING THE PLACE OF INSTALLATION:
Waste water resulting from the regeneration must be
funneled into the floor sink by the flexible pipe.
If the floor sink is placed higher than the water
softener, the maximum height acceptable is 1.8
metres, provided that the pipe is not longer than 5
metres and the pressure of the water system is at
least 2.8 bar.
If the water softener is near a boiler, check that the
pipes and the water softener itself are not subjected
to overheating. If possible, install a pipe that keeps a
few meters’ distance (at least 3) between the outlet
of the water softener and the inlet of the boiler.
Keep away from corrosive or acid products.
CONNECTION TO THE DRAIN SYSTEM (A)
.
The drain pipe is not flattened or bent, as water should
flow without impedements.
THE OVERFILL PROTECTION PIPE (B)
Insert flexible pipe in the quick joint, then connect the
pipe to a floor sink that must be placed under the quick
joint, because the water that may come out will
not be pressurized.
ELECTRIC AND ELECTRONIC COMPONENTS:
A-OPTICAL SENSOR
B-AC ADAPTER INPUT
C-MAIN MOTOR & OPTICAL SENSOR
D-VOLUMETRIC TURBINE INPUT
E-CHLORINE GENERATOR OUTLET