Dux Endurance six Скачать руководство пользователя страница 29

20616780

The hot water supply pipework is required to be insulated with Ensolex or similar  

insulation from the hot water heater to all outlet points within the building.

INSTRUCTIONS FOR UNITS SUPPLIED SET AT 50℃ TO  
COMPLY WITH AS 3498-2009. 

 
PLEASE NOTE THIS 50℃ UNIT IS NOT TO BE USED IN 
CONJUNCTION WITH SOLAR WATER HEATERS. 

 

1) This water heater is to be installed to comply with AS/NZS 3500.4 and AS5601 
    codes and any local by laws or regulations. 
2) Please refer to the Installation / Operating instructions supplied with this water 
    heater for details of the installation procedure. 
3) When installing the water heater hot water pipework please refer to the following 
    pipework installation requirements (Diagram 1) to comply with the AS3498-2009 
    code. The first outlet valve (tap) should be a minimum of Four (4) metres from  
    the water heater outlet.

Valve 1.

Valve 2.

Outlet to deliver hot  
water to sanitary  
fixtures

Hot water outlet 
 

Pipe size 20mm

L

COMMISSIONING THE WATER HEATER. 
1) After completion of the water heater installation the following commissioning 
    procedure is to be implemented. 
   a) Before turning on the water heater power supply and gas supply, purge all  
       air from the Hot water supply pipework. 
   b) Turn on the power, allow 30 seconds for the water heater to check safety 
       functions. Turn on the gas supply. 
   c) Turn on Valve 1. to a minimum flow rate (approximately 3 l/m) and allow 
       the water heater to operate for approximately Two(2) minutes and check the  
       flowing water temperature using a digital thermometer. 
   d) Repeat above procedure (c) at the maximum possible flow rate. 
   e) The water temperature will be delivered at 48-50℃ continuously. 
    f ) If the water heater does not deliver water at this temperature contact you  
       supplier or DUX Hot Water on 1300 365 115 for advice. 
 
                                       PLEASE SEE REVERSE SIDE.

Diagram 1.

Minimum of distance of pipework  
L to Valve 1 is Four (4) metres.

Содержание Endurance six

Страница 1: ......

Страница 2: ......

Страница 3: ...The Endurance Six is pre set at 50 C maximum water temperature...

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ...Six is pre set at 50 C maximum water temperature to comply with AS3498 2009 Consequently it does not require a tempering valve If remote controllers are installed the maximum temperature setting will...

Страница 19: ...Six is pre set at 50 C maximum water temperature to comply with AS3498 2009 Consequently it does not require a tempering valve If remote controllers are installed the maximum temperature setting will...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ...ter outlet Valve 1 Valve 2 Outlet to deliver hot water to sanitary fixtures Hot water outlet Pipe size 20mm L COMMISSIONING THE WATER HEATER 1 After completion of the water heater installation the fol...

Страница 30: ...y to the fixtures in the property a minimum of Four 4 Metres of pipework must be used between the outlet of the Dux En durance water heater and the first tap and outlet See Diagram below 1 2 The Hot w...

Отзывы: